Click Here & See All Of The Exceptional Talent We Are Working With

Operations Manager (245712) Foundry, Casting, CNC Machining, Extrusion, Stamping, Welding, Assembly Operations / Aerospace, Automotive, Military, Equipment Manufacturing / Will Relo

He is a passive candidate who is currently employed but feels he is underutilized. . He is a strong candidate who consistently exceeds goals/targets and would be a great addition to any leadership team! He is willing to relocate for the right opportunity His history includes:

  • Proposed the justification of an automatic continuous caster with a 10-month ROI in just the cost reduction in labor for billet making and change of process for the jobs with increased demand. This resulted in:
         o This process created top-quality billets that reduced extrusion scrap.
         o Allowed the re-allocation of 5 employees from the foundry, where retention is low, to other departments.
         o Reduces the cost of new hires.
         o Creates consistent casting diameters that increase throughput in the machine shop.
  • Led 2 automation projects increasing productivity by 75% going straight to the bottom line with minimal investment.
  • ERP implementation
  • Direct a 2-shift foundry operation.
  • Implementation of automated mold glue cell and mold closing cell.
         o This resulted in an increase in productivity and quality by 15%.
  • Create SOPs for foundry melt practices and safety standards.
  • Direct the 24 hr./ 3 shift machining operation producing $30M in Revenue.
  • Led $3M capital equipment project to double departmental capacity!
  • Increase departmental productivity by 13% through employee empowerment and ownership!
  • Implementation of a visual management system across 2 departments
  • Increase productivity by 25% through process improvement and maintenance program implementation.
  • Reduce scrap by 20% through process improvement.
  • Increase productivity efficiency by 74% through lean initiatives, process improvement, and maintenance program implementation.
  • Reduced department scrap by 35% through process improvements and a documented training program
  • VA/VE resulting in $3M cost reduction and increase in sales.
  • Process redesign – increase profit margin by 12% and reduce scrap by 72%.

• Operations Management
• Foundry Operations
• Steel Mfg. Operations
• Metal Casting Operations
• Green Sand Molding Line
• Beta Set No Bake Molding Line
• High Volume CNC Machining Operations
• Extrusion Operations
• Metal Finishing Operations
• Stamping Operations
• Pressing Operations
• Adjusting Production Schedules
• Establishing Production Sequences
• Manufacturing Operations
• Cell Manufacturing Operations
• Batch Manufacturing Operations
• Welding Operations
• Assembly Operations
• Fabrication Operations
• Coating Operations
• Forming Operations
• Shot Blasting Operations
• Fabrications Operations
• Painting Operations
• ERP Implementation – Appicore, Global Shop
• CAPEX Projects
• Holding Kaizens
• OSHA Regulations
• Automotive / Component Manufacturing – Motor Castings, cylinder heads, engine blocks
• Aerospace / Component Manufacturing – Gromax
• Military Equipment Manufacturing – Gromax
• Equipment Parts / Component Manufacturing
• Electrical Instruments / Component Manufacturing. – Gromax
• Fabricated Metal, and Machinery Manufacturing
• Non-Destructive Testing
• Shipping / Receiving Operations
• MRP Systems
• FIFO Systems
• JIT Systems
• HS&E
• ITAR
• ISO 9001
• Solidworks
• 3D Modeling
• AutoCAD
• Identifies At Risk Shipments
• Improving Manufacturing Processes
• Implementation of 6S Program
• Process Troubleshooting
• Managing Multiple Projects
• Increase Departmental Productivity
• Create SOPs for Foundry Melt Practices
• Foundry Quoting
• Implementation Of Visual Management System
• Create and Implement Employee Training Guide
• Cradle to Grave Engineering / Project Management
• New Product Development
• VA/VE Projects
• Mechanical Engineering
• Lean Initiatives
• Cataloged Tooling
• Continuous Cast Bar
• Improving Casting Yield
• Developing Cost Effective Processes
• Value Stream Mapping
• ISO Documentation
• Calculating Production / Labor/ Material Costs
• Continuous Improvement Projects
• Process Optimization
• Order Status Reports
• Plant Maintenance
• Preventative Maintenance
• Resolving Production Bottlenecks / Problems