Click Here & See All Of The Exceptional Talent We Are Working With

Plant Manager / GM (235563) Bachelors, Black Belt / Automotive, Industrial Equipment, Heavy Truck / CNC Machining, Assembly, Painting Operations / Detroit Area

He is actively searching for a new leadership opportunity in the Detroit area. This could be your opportunity to add to your manufacturing leadership team with a proven performer! This is a talent that can take lemons and turn it into lemonade! Don’t delay or you will miss the opportunity to raise the bar in your organization! His impressive experience includes:

Achieved sales revenue AOP two months after plant relocation.
• Exceeded sales revenue AOP by $1 million in Q4 of 2024
• Successfully lead a production Kaizen event that resulted in a 22% increase in productivity.

Oversaw the launch of the new facility.
• Reduced deficit value by 85% in one year
• Increased first time quality on cylinder headline by 60%.
• Laid groundwork for reduction of 12 direct labor heads
through use of lean manufacturing principles.
• Developed supervisor training program.
• Oversaw the implementation of Maximo as a CMMS.
• Developed accurate process Takt Time.
• Upgraded the TPM and PM process and displayed the attainment percentage visually.
• Oversaw launch of Ford I6 Dragon Balance Shaft
Increased OEE from 62% to 71%
• Reduced TRIR from 5.6 to 1.6

Reduced internal scrap rate from 2.2% of sales to 1.0% of sales.
• Lowered overtime rate from 13.4% to 9.9% on equivalent sales
• Plant closed operations during COVID.
• Achieved PPAP approval five months after purchase of the facility.
• Developed training process for supervisors, job setters, and hourly operators.
• Hired and developed a
manufacturing team and 95% of staff level associates.
Averaged 91.5% OEE in 2016-2017
• Averaged 0.86% Scrap Rate in 2016-2017
• Below CPU goal every month in 2016
• Reduced customer PPM from 643 in 2012 to 150 in 2013
• Increased delivery percentage from 92.7 in 2012 to 96.6 in 2013
• Decreased TRIR from 17.57 in 2011 to 5.93 in 2013
• Reduced average PPAP effort hours by 220 in 2013.
• Reduced operational cost by $150k from 2012 to 2013.

• Team Building and Training
• Project Management
• DMAIC Problem Solving
• Performance Metrics
• Cost Control
• Capital Expenditure Planning
• High Volume CNC Machining Operations
• Adjusting Production Schedules
• Establishing Production Sequences
• Automotive Manufacturing Operations
• Cell Manufacturing Operations
• Batch Manufacturing Operations
• Blending Operations
• Assembly Operations
• Painting Operations
• Shipping / Receiving Operations
• Automotive / Component Manufacturing
• Aerospace / Component Manufacturing
• Equipment Parts / Component Manufacturing
• High Volume Manufacturing
• Batch Manufacturing
• Green Sand Cast Foundry
• Permanent Mold Casting
• MOC Management of Change
• BOM
• Budget Development
• Creating SOPs
• Calculating Production / Labor/ Material Costs
• Continuous Improvement Projects
• Process Optimization
• Process Troubleshooting
• Data Collection / Analysis
• Creating/Implementing Operations Metrics
• Using Visual Systems
• Running Operations on Metrics
• Demand Planning
• Inventory Staging
• Driving Cost Reduction
• Ensuring Future Material Availability
• Ensuring Optimal Inventory
• WIP Inventory Management
• Inventory Controls
• Managing Safety Stock
• Meeting Manufacturing Delivery Targets
• Increasing Production Capacity
• Increasing Throughput
• Reducing Scrap
• Holding Kaizen Events
• 5S / 6S Methods
• Implementing Lean into Manufacturing
• Production Layouts