{"id":491,"date":"2020-07-09T11:15:09","date_gmt":"2020-07-09T15:15:09","guid":{"rendered":"https:\/\/mriomega.com\/?p=491"},"modified":"2025-09-05T01:43:16","modified_gmt":"2025-09-05T05:43:16","slug":"program-management-164295-bsme-green-belt-new-product-development-vave-will-relo","status":"publish","type":"post","link":"https:\/\/mriomega.com\/index.php\/production-operations-quality\/program-management-164295-bsme-green-belt-new-product-development-vave-will-relo\/","title":{"rendered":"Program Management (164295) BSME \/ Green Belt \/ New Product Development \/ VAVE \/ Will Relo"},"content":{"rendered":"<p><strong><span style=\"color: #ff0000;\">Need to jump-start your product development efforts?&nbsp; Are competitors matching your products at a lower price?&nbsp;<\/span> <\/strong>Turn that around with strong product development and program leadership!&nbsp; <span style=\"color: #0000ff;\"><strong>We have an exceptional Program Manager who has led program\/project teams for companies like GE, BAE, Oshkosh to develop new items or improve existing products, processes, and costs<\/strong><\/span>.&nbsp; His track record of successes is long and notable!&nbsp; He is skilled in leading programs and cross-functional teams to organize the brain trust to deliver results that will affect your bottom line and give you competitive advantages.<\/p>\n<p>&nbsp;<\/p>\n<p><strong>Get a jump ahead of your competitors now and lets discuss how to make this happen!&nbsp; Call now at 724 814 3791 or email at&nbsp;<a href=\"mailto:bsweedar@mriomega.com\">bsweedar@mriomega.com<\/a><\/strong><\/p>\n<p>&nbsp;<\/p>\n<p style=\"text-align: center;\"><span style=\"color: #0000ff;\"><em><strong>Program Management (164295) BSME \/ Green Belt \/ New Product Development \/ VAVE \/ Will Relo<\/strong><\/em><\/span><\/p>\n<p>\u2022 <strong>Managed and executed at various levels NPD, VA\/VE, Product optimization, Process Development, and Change management<\/strong><br \/>\n<strong>\u2022 Team building, cross-functional leadership skills and strategic thinking brings value to the project&nbsp;<\/strong>and implement successfully.<br \/>\n\u2022 Working exposure with different companies like&nbsp; GE Healthcare, GE Energy, BAE systems, Oshkosh, Ericsson, Sanmina-Sci, Electrolux, and Transocean<br \/>\n\u2022 <strong>Developed documents and methodologies on VA\/VE, CAD best practices, QMS, MBD and Enclosure design<\/strong><br \/>\n<strong>\u2022 Developed VAVE and Teardown &amp; Benchmarking manual<\/strong><br \/>\n\u2022 Provide engineering leadership for business simplification by devising value methodology, i<strong>mplementing a GATE process, and driving a portfolio of NPD and value engineering projects.<\/strong><br \/>\n\u2022 Developed business processes while assembling a top tier integrated product team (IPT) and <strong>steer design-to-value (DtV) methods.<\/strong><br \/>\n\u2022 Manage VAVE programs with KPI\u2019s<br \/>\n\u2022 <strong>Cost Optimization &amp; Business Simplification: <\/strong><br \/>\n<strong>&nbsp; &nbsp; &nbsp;o Generated ~$1M in average annual cost savings <\/strong><br \/>\n<strong>&nbsp; &nbsp; &nbsp;o Implemented 70+ value analysis\/value engineering (VAVE) projects to enhance product margins. <\/strong><br \/>\n<strong>&nbsp; &nbsp; &nbsp;o Performed spend data and identified cost drivers in the product. <\/strong><br \/>\n<strong>&nbsp; &nbsp; &nbsp;o Demonstrated in using VE- FAST approach.<\/strong><br \/>\n\u2022 Developed Teardown and Benchmarking process and methodology<br \/>\n<strong>\u2022 Planned and executed 40+ Internal and Supplier workshops over a period of 5 years<\/strong><br \/>\n<strong>\u2022 Developed VAVE\/Product optimization manual<\/strong><br \/>\n\u2022 Program Management: Executed programs to <strong>enhance product profitability by 2 to 5%<\/strong> by delivering NPI, Value engineering and Competitor benchmarking.<br \/>\n\u2022 <strong>Supplier Management: Coordinated with domestic and global suppliers in early involvement to NPI and Fact-based cost reductions around $800K.<\/strong><br \/>\no <strong>Assisted sourcing team on supplier qualification<\/strong><br \/>\n<strong>&nbsp; &nbsp; &nbsp;o Enhance APQP<\/strong><br \/>\n<strong>&nbsp; &nbsp; &nbsp;o Reduce defects by analyzing warranty <\/strong><br \/>\n<strong>&nbsp; &nbsp; &nbsp;o Developed Pre-Inventory management to meet targets savings.<\/strong><br \/>\n\u2022 Corporate Social Responsibility (CSR): Earned recognition for a project to<strong> reduce polyurethane (PU) by 20%<\/strong><br \/>\n\u2022 Worked on major projects \u2013 CT NPD and CT HD Redesign<br \/>\n\u2022 Day-to-day activities on CAD (Pro\/E (Creo)), Wind-chill and I-deas &amp;Team center<br \/>\n\u2022<strong> Executed Value engineering projects such as telescopic boom lifter platform, Power line supplier, Fender redesign, Control panels and Consumer goods<\/strong><br \/>\n<strong>&nbsp; &nbsp; &nbsp;o Saved ~15% cost and ~30% on assembly time<\/strong><br \/>\n\u2022 Performed make-buy analysis<br \/>\nPerformed patent infringement and competitor benchmarking. Worked with Medtronic, BAE systems, Electrolux,<br \/>\n\u2022<strong> Product Design &amp; Development: Worked on different Telecom\/Computer storage servers product design and developments<\/strong><br \/>\n<strong>&nbsp; &nbsp; &nbsp;o Achieved average of $25\/unit server on new designs optimizing standard COTS use and assembly process<\/strong><br \/>\n\u2022 Statistical Process Control (SPC) and Other tools: Implemented tools including QFD, Pugh Matrix, Brainstorming, Root Cause Analysis and DFMEA<br \/>\n\u2022 Performed VA&amp;VE on Design qualification (DQ) and Installation qualifications (IQ) as per specs<\/p>\n<p><strong>Skills<\/strong><br \/>\n\u2022 CAD Tools : Creo &amp; Pro\/Engineer WF, NX9.0, CATIA, Auto CAD, and Solid works<br \/>\n\u2022 PDM\/PLM : Pro\/Intralink, Windchill-PDM link, Agile and Team Center<\/p>\n<p>\u2022 <strong>Leading Design to Value Projects<\/strong><br \/>\n<strong>\u2022 Evaluating Feature Values and Costs<\/strong><br \/>\n<strong>\u2022 Managing NPD Projects Start to Finish<\/strong><br \/>\n<strong>\u2022 Selecting Components for Evaluation<\/strong><br \/>\n\u2022 Validation Implementation Verification Process<br \/>\n\u2022 Driving Technology and Procurement Strategies<br \/>\n\u2022 Brainstorming \/ Innovating New Solutions<br \/>\n\u2022 Idea Generation\/Brainstorming<br \/>\n\u2022 NPD (New Product Development) Stage-Gate process<br \/>\n\u2022 Product Design<br \/>\n\u2022 3D CAD<br \/>\n\u2022 DFMEA\/PFMEA\/FEA<br \/>\n\u2022 Should Cost Techniques<br \/>\n\u2022 Risk Management<br \/>\n\u2022 Concept phase<br \/>\n\u2022 Product life cycle<br \/>\n\u2022 Target costing<br \/>\n\u2022 Design to value<br \/>\n\u2022 Equipment Teardown<br \/>\n\u2022 Supplier Cost structure<br \/>\n\u2022 Design for Manufacturing<br \/>\n\u2022 Value Stream Mapping<br \/>\n\u2022 Benchmarking<br \/>\n\u2022 Cost Driver analysis<br \/>\n\u2022 Kano<br \/>\n\u2022 Requirements Management<br \/>\n\u2022 Functional Modeling<br \/>\n\u2022 Lifecycle Cost Model<br \/>\n\u2022 Target Costing<br \/>\n\u2022 QFD<br \/>\n\u2022 Cost Analysis\/Optimization<br \/>\n\u2022 Coordinating projects with multiple departments<br \/>\n\u2022 Engineering Management<br \/>\n\u2022 Technology Management<\/p>\n<p><strong>Education and Certifications<\/strong><br \/>\n\u2022 Diploma Mechanical Engineering<br \/>\n\u2022 Bachelors Mechanical Engineering<\/p>\n<p><strong>Certificates<\/strong><br \/>\n\u2022 Six Sigma-DMAIC Green Belt<br \/>\n\u2022 Future manager program<br \/>\n\u2022 Emerging leadership<br \/>\n\u2022 Negotiation skills<br \/>\n\u2022 NLP Practitioner &amp; Master Practitioner<br \/>\n\u2022 Influence without authority<br \/>\n\u2022 Project management<br \/>\n\u2022 Empowering project teams and facilitating collaboration<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Need to jump-start your product development efforts?&nbsp; Are competitors matching your products at a lower price?&nbsp; Turn that around with strong product development and program leadership!&nbsp; We have an exceptional Program Manager who has led program\/project teams for companies like GE, BAE, Oshkosh to develop new items or improve existing products, processes, and costs.&nbsp; His&#8230;<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[311],"tags":[28,30,32,36,135,144,229,230,231,232,233,234,235,236],"class_list":["post-491","post","type-post","status-publish","format-standard","hentry","category-production-operations-quality","tag-manufacturing","tag-apqp","tag-bsme","tag-mriomega","tag-project-management","tag-green-belt","tag-new-product-development","tag-vave","tag-warranty","tag-value-engineering","tag-dtv","tag-npd","tag-benchmarking","tag-program-management"],"acf":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/posts\/491","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/comments?post=491"}],"version-history":[{"count":2,"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/posts\/491\/revisions"}],"predecessor-version":[{"id":668,"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/posts\/491\/revisions\/668"}],"wp:attachment":[{"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/media?parent=491"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/categories?post=491"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/tags?post=491"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}