{"id":423,"date":"2020-05-20T12:15:30","date_gmt":"2020-05-20T16:15:30","guid":{"rendered":"https:\/\/mriomega.com\/?p=423"},"modified":"2025-09-05T01:43:18","modified_gmt":"2025-09-05T05:43:18","slug":"engineering-maintenance-manager-six-sigma-green-belt-sap-change-agent-169388-will-relo","status":"publish","type":"post","link":"https:\/\/mriomega.com\/index.php\/maintenance\/engineering-maintenance-manager-six-sigma-green-belt-sap-change-agent-169388-will-relo\/","title":{"rendered":"Engineering Maintenance Manager (163988) \/ Six Sigma Green Belt \/ SAP \/ Change Agent \/ Will Relo"},"content":{"rendered":"<p><strong>Need to improve equipment reliability and take your maintenance team to the next level<\/strong>?&nbsp; We have a <strong>WV <span style=\"color: #0000ff;\">Engineering &amp; Maintenance Manager<\/span>with a track record of developing low-cost improvements that realize significant cost savings and increased productivity within manufacturing operations.<\/strong> He is a <span style=\"color: #0000ff;\"><strong>Six Sigma Green Belt<\/strong><\/span> who has held leadership positions in 7 greenfield startups and is adept in both <strong>union and non-union<\/strong> relationships; team building; problem-solving; principle-centered leadership; and continuous process improvement, He is skilled in implementing cultural change initiatives, improving revenue and quality, and adding profit to the company\u2019s bottom line. <strong>He has successfully moved operations from reactive maintenance to preventative and then predictive programs.&nbsp;<\/strong><\/p>\n<p><strong><span style=\"color: #0000ff;\">Engineering Maintenance Manager \/ Six Sigma Green Belt \/Reliability, Preventative \/&nbsp; Predictive maintenance (169388)&nbsp; Will relo&nbsp;<\/span><\/strong><\/p>\n<p><strong>His experience with plant mechanical, electrical equipment, leadership skills, and reliability programs make him a very strong addition for any team<\/strong> <strong>call 724 814 3791 or email&nbsp;&nbsp;<\/strong><strong><a href=\"mailto:bsweedar@mriomega.com\">bsweedar@mriomega.com<\/a><\/strong><strong>&nbsp;to set up a quick meeting with this extraordinary leader<\/strong><\/p>\n<ul>\n<li>He has managed a large-scale conversion of over 4500-point Emerson distributive control system from Provox to DeltaV, including the conversion for current data historian.<\/li>\n<li>Reliability Centered Maintenance<\/li>\n<li>Equipment Preventative Maintenance<\/li>\n<li>Improving Equipment Reliability<\/li>\n<li>Reliability Block Diagrams<\/li>\n<li>Identifying Equipment Deficiencies<\/li>\n<li>Rotating Equipment Troubleshooting<\/li>\n<li>Developing Standard Operating Procedures<\/li>\n<li>Process Safety Information<\/li>\n<li>Establishing Written Procedures<\/li>\n<li>Maintaining Process Equipment Integrity<\/li>\n<li>Reporting Unsafe Equipment<\/li>\n<li>Testing Process Equipment<\/li>\n<li>Non Destructive Testing<\/li>\n<li>Maintaining Process Equipment Inspection Documentation<\/li>\n<li>Ensuring Spare Parts Meet Code<\/li>\n<li>Eliminating Work Order Backlogs<\/li>\n<li>Inspection \/ Testing Task Planning<\/li>\n<li>Training Contractors On Processes<\/li>\n<li>Using CMMS Software<\/li>\n<li>Managing Capital Projects<\/li>\n<li>Mechanical Integrity Programs<\/li>\n<li>Leading Maintenance TeamsLeading Engineering Teams<\/li>\n<li>Turnaround Planning<\/li>\n<li>Six Sigma Green Belt<\/li>\n<li>Managing PM Work Orders<\/li>\n<li>Inspection Tracking Systems<\/li>\n<li>Maintaining Service Documentation<\/li>\n<li>Maintaining Mechanical Integrity Equipment List<\/li>\n<li>Maintaining Mechanical Integrity Documentation<\/li>\n<li>Equipment Evaluation \/ Selection<\/li>\n<li>Thermography<\/li>\n<li>Team Builder &amp; Coach (120)<\/li>\n<li>Relationship Building &amp; Management<\/li>\n<li>Value Stream Management &amp; Accountability<\/li>\n<li>Analytical Troubleshooting<\/li>\n<li>Managing Multiple Plant Projects<\/li>\n<li>Maintaining ASME Certifications On Pressure Vessels<\/li>\n<li>Capital Project Planning<\/li>\n<li>Powerplant Operations<\/li>\n<li>Working With Contractors<\/li>\n<li>Process Safety Management<\/li>\n<li>Developing Predictive Maintenance Programs<\/li>\n<li>Process Safety Management (PSM)<\/li>\n<li>Project Prioritization<\/li>\n<li>Operational Hazard Analysis<\/li>\n<li>Failure Analysis Investigations<\/li>\n<li>Parts Stress Modeling<\/li>\n<li>Fault Tree Analysis<\/li>\n<li>Finite Element Method<\/li>\n<li>Thermal Analysis<\/li>\n<li>Risk Analysis<\/li>\n<li>Root Cause Analysis (RCA)<\/li>\n<li>DOE<\/li>\n<li>Electrical Power Distribution:<\/li>\n<\/ul>\n<p><strong>TECHNICAL SKILLS<\/strong><\/p>\n<ul>\n<li>Control Engineer: Programming many different Distributive Control systems: Emerson DeltaV, Provox, Rosemont rs3, Bailey net90, and infi-90.<\/li>\n<li>o N<strong>umerous PLC platforms<\/strong> Rockwell Allen Bradley controllogix, PLC5. PLCII, micrologics. Modicon, GE Fanuc, and Texas Instruments.<\/li>\n<li>o Many different man-machine interface software packages as well as numerous data historian systems.<\/li>\n<li>I have many <strong>years of experience in power distribution up to and including 148KV.<\/strong> This experience was mostly gained through power plant-related projects, both nuclear and cogeneration.<\/li>\n<li>Operational Excellence Competencies: Master Planning, Kaizen Events, Fishbone Diagramming, Problem Solving, 3G\u2019s, 5S Improvement System, Spider Diagraming your Success, Safety System, and Departmental Audits.<\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p><strong>Education<\/strong><\/p>\n<ul>\n<li>Christopher Newport University \/ Electrical, Electronic and Communications Engineering Technology\/Technician<\/li>\n<li>KCOE &#8211; St. Vincents College \/ Operational Excellence \/ 2010 \u2013 2011KCOE &#8211; St. Vincents College &#8211; 2 years of work shop. forums, conferences while being coached by a great team at Kennametal Center of Operational Excellence at St. Vincents College in Latrobe Pa.<\/li>\n<li>Kansas State University &#8211; 4-semester Instrumentation<\/li>\n<li>Six Sigma Green Belt Certificate<\/li>\n<li>OSHA 10 Hour<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>Need to improve equipment reliability and take your maintenance team to the next level?&nbsp; We have a WV Engineering &amp; Maintenance Managerwith a track record of developing low-cost improvements that realize significant cost savings and increased productivity within manufacturing operations. He is a Six Sigma Green Belt who has held leadership positions in 7 greenfield&#8230;<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[310],"tags":[28,36,49,57,79,135,181,182,183,184],"class_list":["post-423","post","type-post","status-publish","format-standard","hentry","category-maintenance","tag-manufacturing","tag-mriomega","tag-sap","tag-plc","tag-cmms","tag-project-management","tag-maintenance-manager","tag-engineering-manager","tag-predictive-maintenance","tag-preventative-maintenance"],"acf":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/posts\/423","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/comments?post=423"}],"version-history":[{"count":4,"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/posts\/423\/revisions"}],"predecessor-version":[{"id":647,"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/posts\/423\/revisions\/647"}],"wp:attachment":[{"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/media?parent=423"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/categories?post=423"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/tags?post=423"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}