{"id":3687,"date":"2025-11-10T19:43:01","date_gmt":"2025-11-10T23:43:01","guid":{"rendered":"https:\/\/mriomega.com\/?p=3687"},"modified":"2025-11-10T20:03:15","modified_gmt":"2025-11-11T00:03:15","slug":"senior-project-engineer-292993-bsme-pmp-green-belt-certified-proj-mgr-twic-chemicals-pipeline-lng-power-muli-lingual-english-spanish-german-french-willing-to-relo","status":"publish","type":"post","link":"https:\/\/mriomega.com\/index.php\/engineering\/senior-project-engineer-292993-bsme-pmp-green-belt-certified-proj-mgr-twic-chemicals-pipeline-lng-power-muli-lingual-english-spanish-german-french-willing-to-relo\/","title":{"rendered":"Senior Project Engineer ( 292993) BSME, PMP, Green Belt, Certified Proj Mgr, TWIC \/ Chemicals, Pipeline, LNG, Power \/ Muli-Lingual &#8211; 4 languages \/ Willing to relo"},"content":{"rendered":"\n<p>B<strong>attle-tested industrial Project Manager<\/strong> who <strong>keeps complex EPC and plant projects on schedule, in scope, and audit-ready<\/strong>\u2014from <strong>greenfield builds<\/strong> to <strong>brownfield turnarounds<\/strong>\u2014while communicating crisply across engineering, construction, QA\/QC, and operations. <strong>He is a project manager who thrives where most projects stall, at\u00a0the intersection of complex engineering, strict safety standards, and unforgiving schedules.<\/strong> With <strong>17+ years across oil &amp; gas, petrochem, power, and industrial construction<\/strong>, he has delivered <strong>greenfield builds, refinery expansions, and multi-million-dollar CAPEX portfolios on time, under budget, and in full compliance<\/strong>.<br><br><strong>A four-language communicator and Lean Six Sigma Green Belt<\/strong>, Johnny aligns EPC partners, regulators, and operations teams to de-risk schedules, drive cost control, and keep critical projects moving. He is Fluent in English, German, Spanish and French.\u00a0\u00a0If <strong>RFIs, MOCs, or permitting<\/strong> are dragging timelines, Johnny has fixed those exact problems.\u00a0 He has successfully managed projects for companies like CBI, Shell, NRG Energy, Worley, Huntington Ingalls, Henkel, Cabot and more!\u00a0 This GlobeTrotter is willing relocate.to where the work is!\u00a0 His impressive background includes:<br><\/p>\n\n\n\n<p><strong>Project Manager | Oil &amp; Gas \u2022 Petrochem \u2022 Power \u2022 Industrial Construction<\/strong><br><em>PMP | Lean Six Sigma Green Belt | TWIC (2024\u20132029) | Fluent: English, German, Spanish, French<\/em><\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td><strong>Industry Pain Point<\/strong><\/td><td><strong>His Response<\/strong><\/td><\/tr><\/thead><tbody><tr><td><strong>Schedule slips &amp; blown budgets<\/strong><\/td><td>Delivered capital &amp; maintenance projects <strong>on time \/ within budget<\/strong> across chemicals (Cabot, Henkel, Worley), petrochem, and power; rigorous <strong>CAPEX\/OPEX control<\/strong>, forecasting, and earned-value progress reporting.<\/td><\/tr><tr><td><strong>Greenfield complexity &amp; startup risk<\/strong><\/td><td>Led <strong>greenfield civil\/foundation<\/strong> build at Forgen; <strong>560 MW Carlsbad Energy Center<\/strong> (NRG) support from construction through permitting, water systems, simulator data, and QA\/QC handoffs.<\/td><\/tr><tr><td><strong>EPC coordination &amp; change control<\/strong><\/td><td>Orchestrated <strong>MOC governance<\/strong> (Shell) and RFI\/submittal workflows; drove <strong>multidisciplinary alignment<\/strong> among engineering, construction, QC, and operations to reduce rework and delays.<\/td><\/tr><tr><td><strong>Regulatory, safety &amp; compliance<\/strong><\/td><td>OSHA-driven site practices; partnered with environmental, city\/county\/state authorities (NRG) to secure <strong>permits\/approvals<\/strong>; TWIC-cleared; safety-first planning and method statements.<\/td><\/tr><tr><td><strong>Scope creep &amp; poor documentation<\/strong><\/td><td>Builds <strong>clear scopes, WBS, and functional specs<\/strong>; maintains <strong>as-built documentation, lessons learned, and turnover packages<\/strong>; strong change management to protect cost &amp; schedule.<\/td><\/tr><tr><td><strong>Vendor\/supplier delays<\/strong><\/td><td><strong>Expedites long-lead items<\/strong>, validates submittals, and tracks delivery status; experience across heavy equipment, piping, and specialty systems; resolves field issues with rapid engineering support.<\/td><\/tr><tr><td><strong>Fragmented communications (multi-site, multi-lingual)<\/strong><\/td><td><strong>Four languages<\/strong> and seasoned stakeholder manager; drives consensus with trades, EPC partners, and client leadership; translates technical risks into actionable plans.<\/td><\/tr><tr><td><strong>Tooling &amp; reporting gaps<\/strong><\/td><td>Advanced user of <strong>Primavera P6, MS Project, Procore, SharePoint, Bluebeam, AutoCAD\/SolidWorks<\/strong>; produces <strong>KPI dashboards<\/strong> (cost, schedule, quality, safety) for executive visibility.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><strong>Selected Role Highlights<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Shell (2025)<\/strong> \u2013 MOC Engineer\/Coordinator: owns <strong>concurrent MOCs<\/strong> in polyethylene manufacturing; establishes governance, document control, and close-out discipline.<\/li>\n\n\n\n<li><strong>Forgen (2024)<\/strong> \u2013 Sr. Project Engineer: <strong>greenfield plant foundations<\/strong>; design-build lifecycle oversight, resource planning, safety &amp; QA alignment.<\/li>\n\n\n\n<li><strong>Entegee (2023)<\/strong> \u2013 Mechanical Field Engineer: refinery <strong>construction\/testing<\/strong> (hydrostatic\/pneumatic\/integrity), turnover readiness.<\/li>\n\n\n\n<li><strong>Cabot (2022)<\/strong> &amp; <strong>Henkel (2021\u201322)<\/strong> \u2013 Project Manager: <strong>capex portfolio<\/strong> from inception through commissioning; feasibility, capital controls, stakeholder alignment.<\/li>\n\n\n\n<li><strong>NRG (2017\u201318)<\/strong> \u2013 Project Engineer: <strong>560 MW power plant<\/strong> build\u2014permits, water systems, simulator data, QC testing, and piping progress control.<\/li>\n\n\n\n<li>Earlier: CB&amp;I (nuclear modules), Oil States (offshore cranes), Weatherford (pipeline pre-commissioning) \u2014 <strong>hands-on construction &amp; commissioning<\/strong> exposure.<\/li>\n<\/ul>\n\n\n\n<p><strong>Education<br><\/strong>Mechanical Engineering (Bachelor&#8217;s Degree) \/ University of Louisiana at Lafayette- LA<\/p>\n\n\n\n<p><strong>Certifications and Licenses<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Project Management Professional (PMP)\u00ae Present<\/li>\n\n\n\n<li>Lean Six Sigma Green Belt March 2022 to Present<\/li>\n\n\n\n<li>Six Sigma Certification PMI Certification<\/li>\n\n\n\n<li>Lean Six Sigma Certification<\/li>\n\n\n\n<li>Certified Project Manager<\/li>\n\n\n\n<li>TWIC February 2024 to February 2029<\/li>\n\n\n\n<li>PMP November 2022 to November 2025<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>Battle-tested industrial Project Manager who keeps complex EPC and plant projects on schedule, in scope, and audit-ready\u2014from greenfield builds to brownfield turnarounds\u2014while communicating crisply across engineering, construction, QA\/QC, and operations. He is a project manager who thrives where most projects stall, at\u00a0the intersection of complex engineering, strict safety standards, and unforgiving schedules. With 17+ years&#8230;<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[307,311,310],"tags":[32,100,144,198,559,598,1635,1636],"class_list":["post-3687","post","type-post","status-publish","format-standard","hentry","category-engineering","category-production-operations-quality","category-maintenance","tag-bsme","tag-power","tag-green-belt","tag-pmp","tag-project-engineer","tag-twic","tag-certified-proj-mgr","tag-muli-lingual"],"acf":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/posts\/3687","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/comments?post=3687"}],"version-history":[{"count":2,"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/posts\/3687\/revisions"}],"predecessor-version":[{"id":3690,"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/posts\/3687\/revisions\/3690"}],"wp:attachment":[{"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/media?parent=3687"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/categories?post=3687"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/tags?post=3687"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}