{"id":3514,"date":"2025-07-07T18:45:55","date_gmt":"2025-07-07T22:45:55","guid":{"rendered":"https:\/\/mriomega.com\/?p=3514"},"modified":"2025-09-05T01:39:34","modified_gmt":"2025-09-05T05:39:34","slug":"maintenance-reliability-project-engineer-280458-pe-pmp-bsme-primavera-professional-will-relo","status":"publish","type":"post","link":"https:\/\/mriomega.com\/index.php\/engineering\/maintenance-reliability-project-engineer-280458-pe-pmp-bsme-primavera-professional-will-relo\/","title":{"rendered":"Maintenance Reliability \/ Project Engineer (280458) PE, PMP, BSME, Primavera Professional \/ Will Relo"},"content":{"rendered":"\n<p>H<strong>ighly skilled Mechanical Maintenance and Reliability Engineer with extensive experience in refinery maintenance, powerplant operations, asset integrity, and mechanical integrity programs. He is a BSME, a PE Professional Engineer, a Certified PMP, and a Primavera P6 PPM Professional. He also holds API, NVIC, and ABSA certifications. <\/strong>He has a strong foundation in equipment reliability, asset lifecycle management, and turnaround planning, he excels in improving mechanical efficiency, reducing downtime, and implementing preventive maintenance strategies. <strong>His background spans refineries, manufacturing, and cogeneration powerplants<\/strong>, making him a well-rounded candidate for roles requiring maintenance leadership, project management, and reliability engineering expertise. He is currently employed on a contract but is interested in exploring opportunities.<\/p>\n\n\n\n<p>His experience in turnaround planning, failure analysis, and predictive maintenance makes him an ideal fit for companies looking to improve mechanical uptime, reduce downtime, and enhance overall equipment efficiency.  His experience includes:<\/p>\n\n\n\n<p><strong>WHY HE STANDS OUT:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Multi-certified technical leader<\/strong> (P.Eng, PMP, API\/NBIC) with 10+ years in oil &amp; gas, refining, and construction.<\/li>\n\n\n\n<li>Proven <strong>turnaround and project leader<\/strong> in high-stakes maintenance and capital projects.<\/li>\n\n\n\n<li>Track record of <strong>$2M+ cost savings<\/strong>, <strong>250k+ field labor hours managed<\/strong>, and reliability gains across asset-intensive operations.<\/li>\n\n\n\n<li>Skilled in <strong>asset integrity<\/strong>, <strong>mechanical integrity programs<\/strong>, <strong>RCFA<\/strong>, and <strong>RBI inspections<\/strong>.<\/li>\n<\/ul>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><td><strong>Industry Pain Point<\/strong><\/td><td><strong>His Strengths \/ Solutions<\/strong><\/td><\/tr><\/thead><tbody><tr><td>\u26d4 Chronic Equipment Downtime<\/td><td>Resolved recurring failures and boosted uptime through root cause analysis and optimized maintenance.<\/td><\/tr><tr><td>\u2699\ufe0f Mechanical Integrity Gaps &amp; Compliance Pressure<\/td><td>API 510\/570\/NBIC certified; led RBI strategies and ensured compliance with ABSA, ASME, and API codes.<\/td><\/tr><tr><td>\ud83d\udee0\ufe0f Turnaround Overruns (Cost &amp; Time)<\/td><td>Directed &gt;$250M in turnaround work with field execution plans, contractor oversight, and risk mitigation.<\/td><\/tr><tr><td>\ud83d\udcb8 Maintenance Cost Overruns<\/td><td>Delivered $2M+ in procurement savings, $500K+ in inspection process optimization, and reduced rework.<\/td><\/tr><tr><td>\ud83d\udcc9 Poor Asset Performance &amp; MTBF<\/td><td>Implemented GE APM, FMEA, Monte Carlo modeling to extend equipment life and forecast risk.<\/td><\/tr><tr><td>\ud83d\udea8 Unplanned Outages &amp; Safety Risks<\/td><td>Developed predictive inspection plans, executed safe start-ups, vessel entry plans, and QA protocols.<\/td><\/tr><tr><td>\ud83e\udd1d Ineffective Contractor Management<\/td><td>Supervised contractors and subcontractors; acted as liaison between construction, ops, and vendors.<\/td><\/tr><tr><td>\ud83d\udcca Lack of Data-Driven Maintenance<\/td><td>Used SAP PM, Power BI, and APM platforms for cost, schedule, and PM tracking to reduce backlog.<\/td><\/tr><tr><td>\ud83d\udd27 Missing Documentation &amp; Standards<\/td><td>Developed SOPs, asset documentation, inspection histories, and ensured standards alignment.<\/td><\/tr><tr><td>\ud83e\uddd1\u200d\ud83c\udfeb Skills Gap in Field Teams<\/td><td>Mentored junior engineers and inspectors; promoted team engagement and professional development.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p><strong>Maintenance &amp; Reliability Engineering<\/strong><br>o Refinery Maintenance (Cokers, Powerplants, Production Equipment)<br>o Large Equipment Refurbishment &amp; Commissioning<br>o Troubleshooting &amp; Resolving Downtime Issues<br>o Improving Mechanical Integrity &amp; Uptime<br>o Asset Lifecycle Management &amp; Utilization Metrics<br>o Predictive Modeling &amp; Corrosion Circuit Mapping<\/p>\n\n\n\n<p><strong>Turnaround &amp; Project Management<\/strong><br>o Planning &amp; Executing Turnarounds<br>o Developing Capital Project Budgets<br>o Managing Preventive &amp; Corrective Maintenance Work Orders<br>o Scheduling &amp; Supervising Contractors<br>o Management of Change (MOC) &amp; Technical Document Review<\/p>\n\n\n\n<p><strong>Mechanical Integrity &amp; Inspection<\/strong><br>o API Codes, ASME Codes, NBIC ISI<br>o Mechanical Integrity &amp; Quality Assurance (MIQA)<br>o Corrosion Analysis, Failure Analysis, &amp; Risk Mitigation<br>o Root Cause Failure Analysis (RCFA)<br>o Non-Destructive Testing &amp; Thermography<br>o Ensuring Spare Parts &amp; Equipment Meet Regulatory Compliance<\/p>\n\n\n\n<p><strong>Software &amp; Technical Skills<\/strong><br>o SAP PM, Reliability Workbench \u2013 GE APM, APM Solutions<br>o 3D CAD Software: AutoCAD, Autodesk Inventor, SolidWorks<br>o Planning &amp; Control: Oracle Primavera P6 PPM Professional<\/p>\n\n\n\n<p>\u2022 Led mechanical maintenance programs in refinery operations and cogeneration powerplants.<br>\u2022 Improved asset efficiency and equipment reliability through predictive modeling and FMEA methodologies.<br>\u2022 Managed and executed planned outages, shutdowns, and turnarounds.<br>\u2022 Developed inspection, testing, and preventive maintenance (ITPM) plans.<br>\u2022 Led corrosion circuit mapping and advanced corrosion modeling to prolong equipment life.<br>\u2022 Conducted failure analysis investigations to eliminate recurring breakdowns.<br>\u2022 Maintained process equipment inspection documentation ensuring compliance with ASME and API codes.<br>\u2022 Optimized preventive and predictive maintenance programs to reduce work order backlogs.<br>\u2022 Developed and managed capital project budgets for major equipment upgrades.<br>\u2022 Supervised contractors and coordinated MOC procedures to improve operational safety.<br>\u2022 Designed and reviewed process control documentation, schematics, and P&amp;IDs.<br>\u2022 Integrated SAP PM and reliability-centered maintenance strategies for improved planning.<\/p>\n\n\n\n<p>\u2022 Refinery Maintenance<br>\u2022 Cokers<br>\u2022 Cogeneration Powerplant Maintenance &#8211; Suncor<br>\u2022 Manufacturing \/ Production Maintenance<br>\u2022 Mechanical Maintenance<br>\u2022 Large Equipment Refurbishment<br>\u2022 Equipment Commissioning<br>\u2022 Resolving Recurring Downtime Issues<br>\u2022 Troubleshooting Equipment<br>\u2022 Improving Asset Efficiency<br>\u2022 Improving Mechanical Integrity \/ Uptime<br>\u2022 Computerized Maintenance Management Software<br>\u2022 Continuous Improvement Programs<br>\u2022 Design Review of MOC \/ Technical Documents<br>\u2022 Developing Capital Project Budgets<br>\u2022 Environmental Compliance<br>\u2022 FMEA<br>\u2022 Lockout \/ Tagout<br>\u2022 Maintenance Leadership<br>\u2022 Planning \/ Executing Turnarounds<br>\u2022 Maintenance Training<br>\u2022 Mechanical Integrity and Quality Assurance (MIQA)<br>\u2022 Mechanical Integrity Programs<br>\u2022 Corrosion Circuit Mapping<br>\u2022 Corrosion Analysis<br>\u2022 Design Failure Analysis<br>\u2022 Monte Carlo Simulations<br>\u2022 Non-Destructive Testing<br>\u2022 Thermography<br>\u2022 Reliability Workbench Software \u2013 GE APM<br>\u2022 Performing Design Review For All MOC Related To Mechanical Equipment<br>\u2022 Planned Outages \/ Turnaround experience<br>\u2022 Planned Preventive Maintenance<br>\u2022 Preventative Maintenance<br>\u2022 Project Management Scheduling<br>\u2022 Reading Schematics \/ Blueprints<br>\u2022 Supervising Contractors<br>\u2022 Ensuring Process Equipment Application Suitability<br>\u2022 Ensuring Spare Parts Meet Code<br>\u2022 Equipment Utilization Metrics<br>\u2022 Establishing Written Procedures<br>\u2022 Managing PM Work Orders<br>\u2022 Eliminating Work Order Backlogs<br>\u2022 Mechanical Integrity Maintenance Training<br>\u2022 API Codes, ASME Codes<br>\u2022 Asset Lifecycle Management<br>\u2022 Advanced Corrosion Modeling<br>\u2022 Identifying Equipment Deficiencies<br>\u2022 Improving Equipment Reliability<br>\u2022 Inspection, Testing and Preventive Maintenance (ITPM) plans<br>\u2022 CML Selection<br>\u2022 Predictive Modeling<br>\u2022 Reducing Mechanical Breakdowns<br>\u2022 Maintaining ASME Certifications On Pressure Vessels<br>\u2022 Reliability Centered Maintenance<br>\u2022 Maintaining Mechanical Integrity Documentation<br>\u2022 Maintaining Process Equipment Inspection Documentation<br>\u2022 Asset Integrity Management systems<br>\u2022 Failure Analysis Investigations<br>\u2022 Management of Change (MOC)<br>\u2022 Operational Hazard Analysis<br>\u2022 Risk Mitigation<br>\u2022 Root Cause Failure Analysis (RCFA)<br>\u2022 APM Solutions<br>\u2022 3D CAD \/ AutoCAD<br>\u2022 Autodesk Inventor<br>\u2022 Solidworks<br>\u2022 SAP PM<\/p>\n\n\n\n<p><strong>EDUCATION &amp; CERTIFICATIONS<\/strong><\/p>\n\n\n\n<p>\u2022 Bachelor of Mechanical Engineering April 2014 \/ Toronto Metropolitan University<br>\u2022 Planning &amp; Control with Oracle Primavera P6 PPM Professional \/ Dec 2024 \/ Eastwood Harris Pty Ltd<br>\u2022 Certified PMP Project Management Professional<br>\u2022 Professional Engineer PE Canada<br>\u2022 APEGA<br>\u2022 API 510\/570<br>\u2022 NBIC ISI<br>\u2022 ABSA IP&amp;V Inspector<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Highly skilled Mechanical Maintenance and Reliability Engineer with extensive experience in refinery maintenance, powerplant operations, asset integrity, and mechanical integrity programs. He is a BSME, a PE Professional Engineer, a Certified PMP, and a Primavera P6 PPM Professional. He also holds API, NVIC, and ABSA certifications. He has a strong foundation in equipment reliability, asset&#8230;<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[307,310],"tags":[32,80,181,198,423,1595,1596],"class_list":["post-3514","post","type-post","status-publish","format-standard","hentry","category-engineering","category-maintenance","tag-bsme","tag-reliability","tag-maintenance-manager","tag-pmp","tag-pe","tag-primavera-professional-will-relo","tag-texas"],"acf":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/posts\/3514","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/comments?post=3514"}],"version-history":[{"count":1,"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/posts\/3514\/revisions"}],"predecessor-version":[{"id":3515,"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/posts\/3514\/revisions\/3515"}],"wp:attachment":[{"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/media?parent=3514"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/categories?post=3514"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/tags?post=3514"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}