{"id":3393,"date":"2025-03-26T18:45:08","date_gmt":"2025-03-26T22:45:08","guid":{"rendered":"https:\/\/mriomega.com\/?p=3393"},"modified":"2025-09-05T01:39:37","modified_gmt":"2025-09-05T05:39:37","slug":"operations-manager-227642-foundry-casting-extrusion-fabrication-assembly-automotive-steel-railroad-will-relo","status":"publish","type":"post","link":"https:\/\/mriomega.com\/index.php\/production-operations-quality\/operations-manager-227642-foundry-casting-extrusion-fabrication-assembly-automotive-steel-railroad-will-relo\/","title":{"rendered":"Operations Manager (227642) Foundry, Casting, Extrusion, Fabrication, Assembly \/  Automotive, Steel, Railroad \/ Will relo"},"content":{"rendered":"\n<p class=\"has-white-color has-vivid-cyan-blue-background-color has-text-color has-background has-link-color wp-elements-45cd3373b561ed2f129f25a9b755df21\">Presenting a self-motivated and dynamic Operations Manager with more than 20+ years of experience working in Manufacturing. He is skilled at managing employees, processes, and technology involved in manufacturing production. He has a strong track record of leading his teams to accomplish production goals while improving quality standards. <strong>He has led teams of up to 400+ people. <\/strong>He is currently employed as an Operations Manager. <strong>His manufacturing experience includes Automotive, Steel, including the casting processes. He is willing to relocate for the right role. <\/strong>His notable experience includes:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Analyze the daily production matrix of the molding and machine groups.<\/li>\n\n\n\n<li>Order all materials needed for the production of Composite Railroad Ties.<\/li>\n\n\n\n<li>Developed, tracked, and reported weekly KPIs to Senior Management and provided recommendations for effective performance management.<\/li>\n\n\n\n<li>Oversee the maintenance department employee for daily items for repair and preventative maintenance<\/li>\n\n\n\n<li>schedule.<\/li>\n\n\n\n<li>Collaborated with the Quality Manager, Plant Manager, and Maintenance Supervisor to achieve the proper segregation of production area and to ensure a safe environment using monthly training, daily safety briefings, and regular inspections for compliance.<\/li>\n\n\n\n<li>Coordinated, supervised, and developed and implemented lean manufacturing into the process of pouring floor.<\/li>\n\n\n\n<li>Administered developments in safety protocols that reduced injuries from 12 loss time to 0 loss time in 2 \u00bd years.<\/li>\n\n\n\n<li>Oversaw implementation of Enterprise Resource Planning (ERP) system to streamline manufacturing operations.<\/li>\n\n\n\n<li>Achieved a 498-pour day average.<\/li>\n\n\n\n<li>Observed production operations and ensured that trained professionals operated machinery in compliance with safety protocols and conducted production tasks to obtain knowledge of methods and processes with 100% adeptness.<\/li>\n\n\n\n<li>Implemented lean and redeployed head count. I reduced a line headcount from 14 down to 6 and increased productivity by 43%<\/li>\n\n\n\n<li>Foundry Operations<\/li>\n\n\n\n<li>Blending Operations<\/li>\n\n\n\n<li>Extrusion Operations &#8211; Evertrak<\/li>\n\n\n\n<li>Shot Blasting Operations<\/li>\n\n\n\n<li>Fabrications Operations<\/li>\n\n\n\n<li>Green Sand Casting<\/li>\n\n\n\n<li>Heat Treat Operations<\/li>\n\n\n\n<li>Painting Operations<\/li>\n\n\n\n<li>Non-Destructive Testing<\/li>\n\n\n\n<li>Shipping \/ Receiving Operations<\/li>\n\n\n\n<li>Automotive \/ Component Manufacturing<\/li>\n\n\n\n<li>Fabricated Metal, and Machinery Manufacturing<\/li>\n\n\n\n<li>High Volume Manufacturing<\/li>\n\n\n\n<li>Batch Manufacturing<\/li>\n\n\n\n<li>Creating SOPs<\/li>\n\n\n\n<li>Using Visual Systems<\/li>\n\n\n\n<li>Inventory Staging<\/li>\n\n\n\n<li>WIP Inventory Management &#8211; Amsted<\/li>\n\n\n\n<li>Inventory Controls<\/li>\n\n\n\n<li>Materials Management<\/li>\n\n\n\n<li>Managing Safety Stock<\/li>\n\n\n\n<li>Meeting Manufacturing Delivery Targets<\/li>\n\n\n\n<li>Increasing Production Capacity<\/li>\n\n\n\n<li>Reducing Scrap<\/li>\n\n\n\n<li>5S \/ 6S Methods<\/li>\n\n\n\n<li>SAP, NetSuite<\/li>\n\n\n\n<li>Implementing Lean into Manufacturing<\/li>\n\n\n\n<li>Production Layouts<\/li>\n\n\n\n<li>Holding Staff Accountable<\/li>\n\n\n\n<li>Preparing Production Schedules<\/li>\n\n\n\n<li>Controlling Labor Costs<\/li>\n\n\n\n<li>ERP Systems<\/li>\n\n\n\n<li>FIFO Systems<\/li>\n\n\n\n<li>Improving Manufacturing Processes<\/li>\n\n\n\n<li>Developing Cost Effective Processes<\/li>\n\n\n\n<li>ISO Documentation<\/li>\n\n\n\n<li>OSHA Regulations<\/li>\n\n\n\n<li>AS9100<\/li>\n\n\n\n<li>Root Cause Analysis<\/li>\n\n\n\n<li>Maintaining Production Paperwork<\/li>\n\n\n\n<li>Plant Visual Systems \u2013 GM, Evertrak<\/li>\n\n\n\n<li>Resolving Production Bottlenecks \/ Problems<\/li>\n\n\n\n<li>P&amp;L Responsibility<\/li>\n\n\n\n<li>Giving Performance Reviews<\/li>\n\n\n\n<li>Production Quality experience<\/li>\n\n\n\n<li>Providing Technical Support<\/li>\n\n\n\n<li>Team Leadership<\/li>\n<\/ul>\n\n\n\n<p><strong>Education<\/strong><br>Southwestern\u00a0Illinois\u00a0College,\u00a0Belleville,\u00a0IL \/ Welding\u00a0Certificate\u00a0and\u00a0Blue\u00a0Print\u00a0Reading\u00a0&#8211; 2002-2004<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Presenting a self-motivated and dynamic Operations Manager with more than 20+ years of experience working in Manufacturing. He is skilled at managing employees, processes, and technology involved in manufacturing production. He has a strong track record of leading his teams to accomplish production goals while improving quality standards. He has led teams of up to&#8230;<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[311],"tags":[132,147,152,346,630,1510],"class_list":["post-3393","post","type-post","status-publish","format-standard","hentry","category-production-operations-quality","tag-foundry","tag-operations-manager","tag-casting","tag-extrusion","tag-fabrication","tag-railroad"],"acf":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/posts\/3393","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/comments?post=3393"}],"version-history":[{"count":1,"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/posts\/3393\/revisions"}],"predecessor-version":[{"id":3394,"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/posts\/3393\/revisions\/3394"}],"wp:attachment":[{"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/media?parent=3393"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/categories?post=3393"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/tags?post=3393"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}