{"id":3092,"date":"2024-09-10T10:18:46","date_gmt":"2024-09-10T14:18:46","guid":{"rendered":"https:\/\/mriomega.com\/?p=3092"},"modified":"2025-09-05T01:39:47","modified_gmt":"2025-09-05T05:39:47","slug":"maintenance-manager-273987-coal-fired-power-plant-mining-operations-msha-certified-foreman-electrician-will-relo","status":"publish","type":"post","link":"https:\/\/mriomega.com\/index.php\/maintenance\/maintenance-manager-273987-coal-fired-power-plant-mining-operations-msha-certified-foreman-electrician-will-relo\/","title":{"rendered":"Maintenance Manager (273987) Coal Fired Power Plant, Mining Operations \/ MSHA Certified Foreman, Electrician \/ Will Relo"},"content":{"rendered":"\n<p>H<strong>ighly skilled Maintenance Manager with 25+ years of experience<\/strong> in heavy equipment operations, construction maintenance, and use of mobile equipment, electronic equipment, excavators, turbines, generators, and other related instrumentation. <strong>He rose through the ranks from laborer and progressed up to Maintenance Manager. He is a Certified MSHA Foreman, Electrician, and Welder.<\/strong> Experienced with hydraulics and pneumatics simultaneous with applying mechanical skills. Implemented strict regulatory health and safety compliance, leading to efficient organizational management. <\/p>\n\n\n\n<p><strong>He has led Multi-craft union maintenance team of 50 people. He possesses a strong PLC background and substation and DCS systems knowledge.<\/strong> His expertise in SAP program implementation enabled him to further coordinate projects with other stakeholders. <strong>His plant is closing down and he is actively looking for a new opportunity. He is willing to relocate.<\/strong><\/p>\n\n\n\n<p>\uf0a7 Optimized and improved production processes of metric tile product through effective oversight, skill development, personnel technical and mechanical training, and leadership, <strong>resulting in 5.0 % decrease in costs productivity of industrial maintenance.<\/strong><br>\uf0a7 <strong>Obtained efficiency improvement by 13%,<\/strong> by leveraging SAP programs for work order creation, purchasing equipment, streamlining scheduling production processes, optimizing resource allocation, and working with the accounting team and various departments.<br>\uf0a7 Utilized expertise in maintaining plant equipment by i<strong>mplementing inventory organization practices, enhancing inventory accuracy by 5.0 %.<\/strong><br>\uf0a7<strong> Achieved 90 % plant production targets and quality standards <\/strong>by establishing effective team leadership and motivation through collaborative efforts.<br>\u2022 <strong>Completed projects ahead of schedule, exceeding expectations<\/strong>, and delivered exceptional time management skills.<\/p>\n\n\n\n<p>\u2022 Construction Materials Manufacturing<br>\u2022 Foundry Operations<br>\u2022 Stamping Operations<br>\u2022 Welding Operations<br>\u2022 Fabrication Operations<br>\u2022 Mining Operations<br>\u2022 General Manufacturing Operations<br>\u2022 Transportation Maintenance<br>\u2022 Ship Manufacturing<br>\u2022 Part\/Component Manufacturing<br>\u2022 Facilities\/Building<br>\u2022 Equipment Manufacturing<br>\u2022 Electronics Manufacturing<br>\u2022 Energy\/ Power Plant<br>\u2022 Heavy Equipt \/ Machinery<br>\u2022 Fleet Operations<br>\u2022 Physical Plant Maintenance<br>\u2022 Electrical Maintenance<br>\u2022 Powerplant Maintenance<br>\u2022 Mechanical Maintenance<br>\u2022 Implementing Preventative Maintenance<br>\u2022 Implementing Predictive Maintenance<br>\u2022 Manufacturing\/Production Line Maintenance<br>\u2022 Developing Maintenance PMs<br>\u2022 Ensuring OSHA Regulations<br>\u2022 Commercial Building \/ Facilities Maintenance<br>\u2022 Facility Maintenance Planning<br>\u2022 Maintenance Planning<br>\u2022 Multicraft Unionized Workforce<br>\u2022 Team Leadership<br>\u2022 Giving Performance Reviews<br>\u2022 Working with Contract Maintenance<br>\u2022 Leading Multiple Shift Maintenance<br>\u2022 Capital Equipment ROI<br>\u2022 Equipment Commissioning<br>\u2022 Equipment Installation<br>\u2022 Moving Production Equipment<br>\u2022 TPM Total Preventative Maintenance<br>\u2022 Improving Equipment Effectiveness (OEE)<br>\u2022 Lockout \/ Tagout<br>\u2022 Root Cause Analysis<br>\u2022 Managing Work Orders<br>\u2022 Troubleshooting Equipment<br>\u2022 Machine Repair<br>\u2022 Reading blueprints<br>\u2022 Dismantling \/ Moving Equipment<br>\u2022 Planning \/ Scheduling \/ Organizing<br>\u2022 Plant Turnarounds<br>\u2022 Project Management<br>\u2022 Maintenance Planning<br>\u2022 Piping Layout<br>\u2022 Reading Blueprints \/ Schematics<br>\u2022 Distributed Control Systems (DCS)<br>\u2022 PLCs<br>\u2022 Boiler Maintenance<br>\u2022 Electronic Controls<br>\u2022 Industrial Ovens<br>\u2022 Pneumatic Systems<br>\u2022 Stamping Presses<br>\u2022 Wastewater Treatment Systems<br>\u2022 Wet Pipe Fire Systems<br>\u2022 Dry Pipe Fire Systems<br>\u2022 Electrical Maintenance<br>\u2022 Conveyor Systems<br>\u2022 Machine Repair<br>\u2022 DC Motors<br>\u2022 AC Motors<br>\u2022 PLC Programming<br>\u2022 Automation Controls<br>\u2022 DCS Systems<br>\u2022 Pipelines<br>\u2022 Pumps<br>\u2022 Cranes<br>\u2022 Heavy Equipment Repair<br>\u2022 Turbines<br>\u2022 Calibrate Transmitters<br>\u2022 Substations<br>\u2022 Transformer Oil Testing<br>\u2022 Thermography<br>\u2022 Vibration Testing<br>\u2022 AutoCAD<br>\u2022 CMMS<\/p>\n\n\n\n<p><strong>Technical Skills<\/strong><br>HTML | LinkedIn | Adobe | Workday | SAP | Google Suite (Docs, Sheets, Slides, Teams) | Web Browser | Word Processing | Microsoft Office Suite (Excel, Spreadsheets, Word, PowerPoint, Outlook, Access)<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Highly skilled Maintenance Manager with 25+ years of experience in heavy equipment operations, construction maintenance, and use of mobile equipment, electronic equipment, excavators, turbines, generators, and other related instrumentation. He rose through the ranks from laborer and progressed up to Maintenance Manager. He is a Certified MSHA Foreman, Electrician, and Welder. Experienced with hydraulics and&#8230;<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[310],"tags":[181,214,540,1253,1254],"class_list":["post-3092","post","type-post","status-publish","format-standard","hentry","category-maintenance","tag-maintenance-manager","tag-union","tag-power-plant","tag-mining-operations","tag-msha-certified-foreman"],"acf":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/posts\/3092","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/comments?post=3092"}],"version-history":[{"count":1,"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/posts\/3092\/revisions"}],"predecessor-version":[{"id":3093,"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/posts\/3092\/revisions\/3093"}],"wp:attachment":[{"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/media?parent=3092"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/categories?post=3092"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/tags?post=3092"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}