{"id":2486,"date":"2024-02-28T14:56:24","date_gmt":"2024-02-28T18:56:24","guid":{"rendered":"https:\/\/mriomega.com\/?p=2486"},"modified":"2025-09-05T01:40:33","modified_gmt":"2025-09-05T05:40:33","slug":"quality-manager-232958-bsit-cqe-cqi-ccic-machining-foundry-forging-stamping-welding-casting-heat-treat-and-injection-molding-will-relo","status":"publish","type":"post","link":"https:\/\/mriomega.com\/index.php\/production-operations-quality\/quality-manager-232958-bsit-cqe-cqi-ccic-machining-foundry-forging-stamping-welding-casting-heat-treat-and-injection-molding-will-relo\/","title":{"rendered":"Quality Manager (232958) BSIT, CQE, CQI, CCIC \/ Machining, Foundry, Forging, Stamping, Welding, Casting, Heat Treat and Injection Molding \/ Will Relo"},"content":{"rendered":"\n<p class=\"has-white-color has-vivid-cyan-blue-background-color has-text-color has-background has-link-color wp-elements-12c93a463db3aa889beb7b707387ed87\"><strong>Quality Manager with 20 years of experience in raising the bar and the profits for manufacturing companies! He has a BS in Industrial Technology and is a CQE Certified Quality Engineer, a CQI Certified Quality Inspector, a CCIC Certified Continuous Improvement Champion, and a Six Sigma Green Belt. He has led quality teams to support Machining, Foundry, Forging, Stamping, Welding, Casting, Heat treatment and Injection Molding operations. This is a Game Changer with broad operations experience, a track record of success, and a Big Quality Tool Box of skills!<\/strong><\/p>\n\n\n\n<p><strong>Due to a downsizing at his employer, he is looking to join a new team! If you are fast and lucky, it might be yours! He is willing to relocate and do so for the right leadership opportunity! Moving further south would be a plus for him! <\/strong>His impressive experience includes:<\/p>\n\n\n\n<p>\u2022 A professional with experience in IATF-19649 Certification, Lean Manufacturing, and Six Sigma methodology.<br>\u2022 Skilled in creating and executing continuous improvement, new models, and cost reduction programs.<br>\u2022 Positive Leader who blends strategic objectives with tactical execution to deliver customer satisfaction, safety and operational effectiveness.<br>\u2022 Lead Daily Department meetings to brainstorm launch concerns, organize problem-solving efforts, and plan future countermeasure activities.<br>\u2022 Responsible for establishing Production Objectives and targets throughout the department.<br>\u2022 Support Technicians and Associates during Kaizen project implementation (KTA). The team has won three Gold medal awards and represented AGC North America in the global tournament.<br>\u2022 Analytical Problem Solver, who diagnoses root causes, creates solutions, and communicates improvements to operators, technicians, and customers.<br>\u2022 Developed the Continuous Improvement program to reduce Customer\u2019 Parts per Million rate from 619 to 21.<br>\u2022 Spearheaded a Yield Improvement team that used DMAIC and Cause\/ Effect methodology to encourage participation and complete problem-solving activities.<br>\u2022 Championed the qualification and implementation of a 3D Digital Non-contact Measuring system.<br>\u2022 The system is used in the following areas, Reverse Engineering, Master Tooling Qualification, and PPAP certification. A $150,000 cost savings.<br>\u2022 Trained Quality Technicians on Gage R&amp;R studies, Calibration techniques, and Customer return analysis.<br>\u2022 Successfully led the upgrade in Test Equipment (Ultrasonic) on four production lines. An $8,800.00 dollar annual cost savings.<br>\u2022 Supervised and trained technicians on Gage R&amp;R studies, fixture\/ gage qualifications and APQP parts approval methodology<br>\u2022 Coordinated PPAP activity including blueprint review, sampling requirements, and measurement results<br>\u2022 Created software programs and inspection forms for reporting quality\/ reliability data<br>\u2022 Introduced and installed equipment on six production lines that reduced ergonomic issues and provided inspection\/ testing data on \u201cCritical to Quality\u201d processes<br>\u2022 Created a Calibration Program to improve equipment efficiency and reduce material usage.<br>\u2022 Developed a sampling plan for lab technicians to monitor copper rod extrusion, conductor insulation and cable assembly processes<\/p>\n\n\n\n<p>\u2022 Managing the Quality Lab<br>\u2022 Managing Quality Teams<br>\u2022 Leading Kaizen Events<br>\u2022 Working With Lean Teams<br>\u2022 Leading Six Sigma Teams<br>\u2022 Performing Kanbans<br>\u2022 Coordinating Lab Activities<br>\u2022 Calibrating Equipment<br>\u2022 Faro Arms<br>\u2022 3D Scanner<br>\u2022 Optical Comparator<br>\u2022 Hardness Testing<br>\u2022 Environmental Chamber<br>\u2022 Torque Tester<br>\u2022 Load Testing<br>\u2022 Using 3D Scanner<br>\u2022 Hardness Testing<br>\u2022 Corrosion Testing<br>\u2022 Non Destructive Testing NDT<br>\u2022 Gage R&amp;R<br>\u2022 GD&amp;T<br>\u2022 ISO Standards<br>\u2022 ASTM Standards<br>\u2022 ISO900, ISO14001<br>\u2022 IATF16949\/TS16949<br>\u2022 MIL-SPEC<br>\u2022 Ford Q1<br>\u2022 ISO Auditing<br>\u2022 Troubleshooting Root Cause<br>\u2022 Implementing Corrective Actions<br>\u2022 Reducing Scrap<br>\u2022 Optimizing Manufacturing Processes<br>\u2022 De-bottlenecking Processes<br>\u2022 PPM Reduction<br>\u2022 Reducing Manufacturing Cycle Time<br>\u2022 Improving Change Order Cycle Time<br>\u2022 Production Attainment Metrics<br>\u2022 Vendor Offsite Supplier Quality<br>\u2022 Production Quality experience<br>\u2022 Directing Quality Team &#8211; 10<br>\u2022 Tracking Concessions \/ Deviations<br>\u2022 Reducing WIP Inventory<br>\u2022 Creating SOP Training<br>\u2022 First Article Inspection FAI<br>\u2022 Using Quality Database Systems<br>\u2022 Process Control Quality Experience<br>\u2022 Internal\/External Quality Audits<br>\u2022 Total Quality Management (TQM)<br>\u2022 Component Design Review<br>\u2022 Statistical Investigations<br>\u2022 Investigating Customer Complaints<br>\u2022 Conducting Trial Fit \/ Function<br>\u2022 Using Control Plans<br>\u2022 Analyzing Production Limitations<br>\u2022 DFMEA \/ PFMEA<br>\u2022 Statistical Process Control (SPC)<br>\u2022 5S \/ 6S<br>\u2022 8D<br>\u2022 New Process Development<br>\u2022 Designing Process Improvement Trials<br>\u2022 Generating Process Control Charts<br>\u2022 Process Testing \/ Validation<br>\u2022 Using Product Reject \/ Defect Investigations<br>\u2022 PPAP<br>\u2022 APQP<br>\u2022 Toyota Production Systems<br>\u2022 Tier 1 Tier 2 Manufacturing<br>\u2022 Machining Operations<br>\u2022 Foundry Operations<br>\u2022 Extrusion Operations<br>\u2022 Forging Operations<br>\u2022 Stamping Operations<br>\u2022 Welding Operations<br>\u2022 Casting Operations<br>\u2022 Assembly Operations<br>\u2022 Heat Treat Operations<br>\u2022 Packaging Assembly<br>\u2022 Coating \/ Painting Operations<br>\u2022 Injection Molding Operations<br>\u2022 Glass Manufacturing<\/p>\n\n\n\n<p class=\"has-white-color has-vivid-cyan-blue-background-color has-text-color has-background has-link-color wp-elements-de460dfaa5c72d695309cf30658c2bf1\"><strong>Education, Training, Certifications<\/strong><\/p>\n\n\n\n<p>\u2022 B.S. &#8211; Industrial Technology, Central State University<br>\u2022 CQE Certified Quality Engineer<br>\u2022 CQI Certified Quality Inspector<br>\u2022 CCIC Certified Continuous Improvement Champion<br>\u2022 Lean Manufacturing Certification- 2001<br>\u2022 Six Sigma Green Belt Certification- 2002<br>\u2022 ISO 9000 Lead Assessor- 2001<br>\u2022 ISO 9000 Auditor- 2002<br>\u2022 5S Program Lead- 2007<br>\u2022 Gate Review Methodology<br>\u2022 Geomagic 3D Imaging system<br>\u2022 PFMEA, Control Plan<br>\u2022 Corrective\/ Preventative Actions<br>\u2022 Managing Production\/ Technical Professionals<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Quality Manager with 20 years of experience in raising the bar and the profits for manufacturing companies! He has a BS in Industrial Technology and is a CQE Certified Quality Engineer, a CQI Certified Quality Inspector, a CCIC Certified Continuous Improvement Champion, and a Six Sigma Green Belt. He has led quality teams to support&#8230;<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[311],"tags":[28,118,132,152,259,278,345,361,398,499,824],"class_list":["post-2486","post","type-post","status-publish","format-standard","hentry","category-production-operations-quality","tag-manufacturing","tag-stamping","tag-foundry","tag-casting","tag-injection-molding","tag-cqe","tag-welding","tag-quality-manager","tag-cqi","tag-forging","tag-ccic-machining"],"acf":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/posts\/2486","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/comments?post=2486"}],"version-history":[{"count":1,"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/posts\/2486\/revisions"}],"predecessor-version":[{"id":2487,"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/posts\/2486\/revisions\/2487"}],"wp:attachment":[{"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/media?parent=2486"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/categories?post=2486"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/tags?post=2486"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}