{"id":2484,"date":"2024-02-28T12:03:39","date_gmt":"2024-02-28T16:03:39","guid":{"rendered":"https:\/\/mriomega.com\/?p=2484"},"modified":"2025-09-05T01:40:33","modified_gmt":"2025-09-05T05:40:33","slug":"quality-cmm-ndt-engineer-235139-foundry-steel-mill-forging-stamping-welding-casting-assembly-and-injection-molding-operations-warren-akron-and-cleveland-oh-areas","status":"publish","type":"post","link":"https:\/\/mriomega.com\/index.php\/production-operations-quality\/quality-cmm-ndt-engineer-235139-foundry-steel-mill-forging-stamping-welding-casting-assembly-and-injection-molding-operations-warren-akron-and-cleveland-oh-areas\/","title":{"rendered":"Quality, CMM, NDT Engineer (235139) Foundry, Steel Mill, Forging, Stamping, Welding, Casting, Assembly, and Injection Molding operations \/ Warren, Akron, and Cleveland OH areas."},"content":{"rendered":"\n<p><strong>OH-based Quality Professional with 14 years of Quality: Quality Assurance\/PPAPs\/Document Control Management. He has 16 Years of NDT UT\/MT\/PT Level II experience. He has supported Foundry, Steel Mill, Forging, Stamping, Welding, Casting, Assembly, and Injection Molding operations. His technical skills include CMM, Faro Arm, 3D scanner, and other lab equipment.<\/strong> <\/p>\n\n\n\n<p><strong>He is currently employed but is interested in exploring new opportunities<\/strong> where he can use his BIG Technical Tool Box and his broad manufacturing operations and quality experience to improve operations. <strong>He is interested in confidentially exploring new opportunities in the Warren, Akron, and Cleveland OH areas. <\/strong>This Game Changer is ready to make a change so don&#8217;t snooze or you will lose out on the opportunity to speak with this great talent! His notable experience includes:<\/p>\n\n\n\n<p>\u2022 14+ years (ISO 9001, 9002:2008\/IATF 16949)<br>\u2022 I perform Micro-Vue Vision System\/CMM (Coordinate Measuring Machine) Inspections for more critical parts using GD&amp;T.<br>\u2022 Experience with IQS, QAD, PPAP, and Quality Audits.<br>\u2022 My education, management, customer service, and computer skills give me the ability to perform in different work settings.<br>\u2022 I had up to 30 direct reports managing a company\u2019s department.<br>\u2022 Using the QAD and QMS software system, I perform annual reviews, updates, and audits of all the Control Plans, PFMEAs, Flow<br>\u2022 Plans when needed.<br>\u2022 Create quality alerts, and RMAs when applicable.<br>\u2022 Conduct quality alert training on non-conforming part issues.<br>\u2022 Manage the PPAP, Material Certifications, Durometer Certifications, Inspection Device Calibrations, Create SPC (CPK-PPKs) Statistical Graphs in Mini-Tab.<br>\u2022 Create programs and when needed use the Micro-Vue Inspect for part inspections.<br>\u2022 Perform first, in-process-end piece inspections for letters, and flyers, making sure they were the correct size and format. Enter data findings in the database system.<br>\u2022 I helped prepare the PPAP&#8217;s entire life cycle for die-casting customers.<br>\u2022 Troubleshooted quality issues, making corrective measures to help guide production personnel in making castings.<br>\u2022 Performed NDT dry powder inspections on suspect castings.<br>\u2022 Perform first piece, in-processing, and last piece dimensional, visual, and CMM (Zeiss\/Calypso) inspections on molded composite parts to ensure accuracy before preparing for shipping.<br>\u2022 Performed CMM Inspections using Micro-Vue Vision System and Automated OGP Smart Scope Zone 3 CMM Inspection\/Programming\/Layouts.<br>\u2022 Performed CMM Polyworks Inspections\/programming on composite parts and tooling for aerospace customers<br>\u2022 Performed hard measurement checks when needed (Using calipers, micrometer, and height gauges.) compared against the actual CMM inspection readings.<br>\u2022 Worked with engineering and department heads daily concerning CMM inspections and CMM programming.<br>\u2022 Had Hexagon tutorial training to prepare myself for the CMM Blue light and white light automated machines expecting to<br>\u2022 arrive and be installed shortly in 2020 before the mass layoff took place. It was currently put on hold.<br>\u2022 Helped manage the Quality Assurance Program including standards, procedures, non-conformances, PPAPs, CAPA, and CNC machine daily audits using the QMS\/ISO guidelines.<br>\u2022 Also filled in for the quality CMM when needed using CMM Faro inspection equipment: Laser Tracker, Faro Arm, and Mitutoyo CMM Machine.<br>\u2022 Document all inspections in the electronic Quality Inspection Log along with, submitting hard copies of the inspection log with material certifications.<br>\u2022 Review all material certifications for each job project before inspecting parts, making sure all required specifications are met.<br>\u2022 Perform Faro Arm CMM (Coordinate Measuring Machine) Inspections for more critical parts using GD&amp;T.<br>\u2022 Established and managed the Quality Control Non-Destructive Testing Inspection program which involved writing and creating the company\u2019s NDT quality control processes-methods, procedures, and specification criteria that were required.<br>\u2022 I reviewed all Mill Test Reports for the proper steel plate chemistry, hardness testing, tensile strength, and heat treating.<\/p>\n\n\n\n<p>\u2022 DM Electrical Discharge Machining<br>\u2022 Foundry Operations<br>\u2022 Cold Rolling Mills<br>\u2022 Forging Operations<br>\u2022 Stamping Operations<br>\u2022 Welding Operations<br>\u2022 Blasting Operations<br>\u2022 Casting Operations<br>\u2022 Assembly Operations<br>\u2022 Fabrications Operations<br>\u2022 Heat Treat Operations<br>\u2022 Packaging Assembly<br>\u2022 Coating \/ Painting Operations<br>\u2022 Injection Molding Operations<br>\u2022 Leading Kaizen Events<br>\u2022 Calibrating Equipment<br>\u2022 Using CMM Equipment<br>\u2022 Programming CMM Equipment<br>\u2022 Faro Arms<br>\u2022 3D Scanner<br>\u2022 Optical Comparator<br>\u2022 Hardness Testing<br>\u2022 Environmental Chamber<br>\u2022 Torque Tester<br>\u2022 Load Testing<br>\u2022 Metallurgy<br>\u2022 Using 3D Scanner<br>\u2022 Cut\/Etch Weld Testing<br>\u2022 Mechanical Testing<br>\u2022 X-ray<br>\u2022 Hardness Testing<br>\u2022 Corrosion Testing<br>\u2022 Liquid Penetrant Testing<br>\u2022 Non Destructive Testing NDT<br>\u2022 Gage R&amp;R<br>\u2022 GD&amp;T<br>\u2022 API Standards<br>\u2022 ISO Standards<br>\u2022 ASTM Standards<br>\u2022 AS9100<br>\u2022 ISO9001, ISO14001<br>\u2022 IATF16949\/TS16949<br>\u2022 MIL-SPEC<br>\u2022 DOD<br>\u2022 ISO Auditing<br>\u2022 Troubleshooting Root Cause<br>\u2022 Implementing Corrective Actions<br>\u2022 Implementing Continuous improvement<br>\u2022 Production Attainment Metrics<br>\u2022 Vendor Offsite Supplier Quality<br>\u2022 Supplier Validation \/ Qualification<br>\u2022 Shop Floor Process Quality<br>\u2022 Quality Training Experience<br>\u2022 Production Quality experience<br>\u2022 Directing Quality Techs<br>\u2022 Tracking Concessions \/ Deviations<br>\u2022 New production line startup<br>\u2022 Reducing WIP Inventory<br>\u2022 Performing TS Audits<br>\u2022 Creating SOP Training<br>\u2022 First Article Inspection FAI<br>\u2022 Quality Engineering<br>\u2022 Tooling Quality<br>\u2022 Process Control Quality Experience<br>\u2022 Performing Internal Quality system audits<br>\u2022 Total Quality Management (TQM)<br>\u2022 Setting Up Quality Systems From Scratch<br>\u2022 Statistical Investigations<br>\u2022 Investigating Customer Complaints<br>\u2022 Documenting Initial Submissions<br>\u2022 Conducting Trial Fit \/ Function<br>\u2022 Using Control Plans<br>\u2022 Process Flow Diagrams<br>\u2022 Pareto Charts<br>\u2022 DFMEA \/ PFMEA<br>\u2022 Statistical Process Control (SPC)<br>\u2022 5S \/ 6S<br>\u2022 8D<br>\u2022 New Process Development<br>\u2022 Delivering Cost Reductions<br>\u2022 Tracking Defects Per Unit<br>\u2022 Sorting Suspect Parts<br>\u2022 PPAP<br>\u2022 APQP<br>\u2022 Minitab<br>\u2022 ERP Software<\/p>\n\n\n\n<p class=\"has-white-color has-vivid-cyan-blue-background-color has-text-color has-background has-link-color wp-elements-028d8e2e477edd0e6fa55bb3bab6ccc0\"><strong>Education:<\/strong><br>\u2022 Associates Degree in Computer Programming and Applied Sciences. \/ Brown Mackie College, Akron, Ohio (Magna Cum Laude College Honor Graduate-3.83 GPA)<br>\u2022 Computer Learning Center, Springfield VA, (6- Month IBM Computer Operations Data Center Trade School)<\/p>\n","protected":false},"excerpt":{"rendered":"<p>OH-based Quality Professional with 14 years of Quality: Quality Assurance\/PPAPs\/Document Control Management. He has 16 Years of NDT UT\/MT\/PT Level II experience. He has supported Foundry, Steel Mill, Forging, Stamping, Welding, Casting, Assembly, and Injection Molding operations. His technical skills include CMM, Faro Arm, 3D scanner, and other lab equipment. He is currently employed but&#8230;<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[311],"tags":[106,116,118,152,259,345,352,354,407,499,823],"class_list":["post-2484","post","type-post","status-publish","format-standard","hentry","category-production-operations-quality","tag-assembly","tag-quality","tag-stamping","tag-casting","tag-injection-molding","tag-welding","tag-ndt","tag-cmm","tag-quality-engineer","tag-forging","tag-steel-mill"],"acf":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/posts\/2484","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/comments?post=2484"}],"version-history":[{"count":1,"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/posts\/2484\/revisions"}],"predecessor-version":[{"id":2485,"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/posts\/2484\/revisions\/2485"}],"wp:attachment":[{"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/media?parent=2484"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/categories?post=2484"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/tags?post=2484"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}