{"id":2044,"date":"2023-06-13T14:11:47","date_gmt":"2023-06-13T18:11:47","guid":{"rendered":"http:\/\/mriomega.com\/?p=2044"},"modified":"2025-09-05T01:40:39","modified_gmt":"2025-09-05T05:40:39","slug":"quality-manager-223408-iatf16949-iso9001-machining-extrusion-stamping-heat-treat-assembly-coating-operations","status":"publish","type":"post","link":"https:\/\/mriomega.com\/index.php\/production-operations-quality\/quality-manager-223408-iatf16949-iso9001-machining-extrusion-stamping-heat-treat-assembly-coating-operations\/","title":{"rendered":"Quality Manager (223408) IATF16949, ISO9001\/ Machining, Extrusion, Stamping, Heat Treat, Assembly, Coating Operations \/"},"content":{"rendered":"\n<p class=\"has-white-color has-vivid-cyan-blue-background-color has-text-color has-background\"><strong>Chicago-based Quality Manager with 20+ years of experience supporting manufacturing operations. He is skilled in all aspects of the Quality Processes for IAT16949 and ISO9001. He is a Certified ISO Auditor and has completed numerous industry educational trainings.<\/strong> Having started his career as a machinist he advanced into Quality Leadership leading teams to support machining, stamping, extrusion, and metal shaping operations. His current company is shutting down their Chicago operations and Thomas is looking for a new Quality Leadership role. This Game Changer&#8217;s notable experience includes:<\/p>\n\n\n\n<p><strong>SOFTWARE:<\/strong> Gagepack, GageTrak, High QA, 8D, QC-CALC S.P.<\/p>\n\n\n\n<p><strong>Operations Supported<\/strong><\/p>\n\n\n\n<p>\u2022 OEM Manufacturing<br>\u2022 Tier 2 Manufacturing<br>\u2022 Machining Operations<br>\u2022 Hi Volume CNC Machining Operations<br>\u2022 EDM Electrical Discharge Machining<br>\u2022 Extrusion Operations<br>\u2022 Stamping Operations<br>\u2022 Assembly Operations<br>\u2022 Heat Treat Operations<br>\u2022 Packaging Assembly<br>\u2022 Heat Treat Operations<br>\u2022 Coating \/ Painting Operations<br>\u2022 Metal Finishing Operations<\/p>\n\n\n\n<p><strong>Competencies<\/strong><\/p>\n\n\n\n<p>\u2022 Directing Quality Techs<br>\u2022 Vendor Offsite Supplier Quality<br>\u2022 Supplier Validation \/ Qualification<br>\u2022 Tooling Quality<br>\u2022 Using Quality Database Systems<br>\u2022 Process Control Quality Experience<br>\u2022 Creating SOP Training<br>\u2022 Quality Management Experience<br>\u2022 Shop Floor Process Quality<br>\u2022 Quality Training Experience<br>\u2022 Production Quality experience<br>\u2022 Performing Internal Quality system audits<br>\u2022 Performing External Quality system audits<br>\u2022 Total Quality Management (TQM)<br>\u2022 Setting Up Quality Systems From Scratch<br>\u2022 Component Design Review<br>\u2022 Using CMM Equipment<br>\u2022 ISIR Submissions<br>\u2022 Statistical Investigations<br>\u2022 Investigating Customer Complaints<br>\u2022 Documenting Initial Submissions<br>\u2022 Conducting Trial Fit \/ Function<br>\u2022 Using Control Plans<br>\u2022 IATF16949\/TS16949<br>\u2022 ISO9001<br>\u2022 PPAP<br>\u2022 APQP<br>\u2022 Gage R&amp;R<br>\u2022 GD&amp;T<br>\u2022 Pareto Charts<br>\u2022 Poka Yoke Assessments<br>\u2022 Analyzing Production Limitations<br>\u2022 De-bottlenecking Processes<br>\u2022 PPM Reduction<br>\u2022 DFMEA<br>\u2022 PFMEA<br>\u2022 Statistical Process Control (SPC)<br>\u2022 DOE Design of Experiments<br>\u2022 5S \/ 6S<br>\u2022 8D<br>\u2022 Ishikawa Diagrams<br>\u2022 Establishing Cpk For Process<br>\u2022 Troubleshooting Root Cause<br>\u2022 Implementing Corrective Actions<br>\u2022 ISO Auditing<br>\u2022 Performing TS Audits<br>\u2022 Working With Lean Teams<br>\u2022 Performing Kanbans<br>\u2022 Implementing Continuous improvement<br>\u2022 New Process Development<br>\u2022 Designing Process Improvement Trials<br>\u2022 Reducing Scrap<br>\u2022 Optimizing Manufacturing Processes<br>\u2022 Reducing Manufacturing Cycle Time<br>\u2022 Delivering Cost Reductions<br>\u2022 Improving Change Order Cycle Time<br>\u2022 Packaging Validation<br>\u2022 Process Analysis<br>\u2022 Generating Process Control Charts<br>\u2022 Process Flow Diagrams<br>\u2022 Product Reject \/ Defect Investigations<br>\u2022 New production line startup<br>\u2022 Project Management<br>\u2022 Working with R&amp;D<br>\u2022 Mechanical Testing<br>\u2022 Hardness Testing<br>\u2022 Corrosion Testing<br>\u2022 First Article Inspection FAI<br>\u2022 Tracking Yield Metrics<br>\u2022 Tracking Defects Per Unit<br>\u2022 Production Attainment Metrics<br>\u2022 Reducing WIP Inventory<br>\u2022 Sorting Suspect Parts<br>\u2022 Calibrating Equipment<br>\u2022 Tracking Concessions \/ Deviations<br>\u2022 ERP Software<\/p>\n\n\n\n<p><strong>EDUCATION:<\/strong><br>\u2022 A.A.S. Degree Moraine Valley Community College Palos Hills, Illinois 1992-1996 \/ Environmental Science minor \/ Art minor<br>\u2022 Associate Design School of Drafting Palos Hills, Illinois \/ Certification in Drafting \/ \u2022 Drafter\/Detailer<\/p>\n\n\n\n<p><strong>SPECIALIZED EDUCATION \/ TRAINING:<\/strong><br>\u2022 ISO 9001:2008 Certification\/Internal Auditor Trained<br>\u2022 ISO 9001:2015 Certification\/Internal Auditor Trained<br>\u2022 GDT Certification and technical diagram Training<br>\u2022 Calibration Certification-training Fox Valley Metrology<br>\u2022 General Drafting Trade School<br>\u2022 ERP: Vantage, JobBoss, GSS, SAP, KMB<br>\u2022 Various Q.A. software: Gagepack, GageTrak, High QA, 8D, QC-CALC S.P.C.<br>\u2022 Non-Contact Vision Measurement: OMIS II ROI, AutoMap software<br>\u2022 CMM Contact\/Non-Contact Vision Measurement: Sprint 300 ROI, eBx software<br>\u2022 CMM Contact Measurement: Brown &amp; Sharpe, PC-DEMIS 4.0 software<br>\u2022 Height Gage Measurement: Trimos Altia<br>\u2022 Surface\/Roughness Tester: Mitutoyo SJ-400<br>\u2022 Various other inspection equipment: Digital Bore Gages, Air Gages, Calipers,<br>\u2022 Micrometers, etc.10 years Safety Manager<br>\u2022 12 years plus Knowledge, experience in PPAPS, ISIRS, SPC, etc.<br>\u2022 Microsoft: Excel, Word, Power Point, Access, Outlook<br>\u2022 CNC Mills Operator\/Setups<br>\u2022 Setups and operations in Secondary Machinery<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Chicago-based Quality Manager with 20+ years of experience supporting manufacturing operations. He is skilled in all aspects of the Quality Processes for IAT16949 and ISO9001. He is a Certified ISO Auditor and has completed numerous industry educational trainings. Having started his career as a machinist he advanced into Quality Leadership leading teams to support machining,&#8230;<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[311],"tags":[34,106,117,148,158,346,361,393,486,535,688],"class_list":["post-2044","post","type-post","status-publish","format-standard","hentry","category-production-operations-quality","tag-automotive","tag-assembly","tag-machining","tag-cnc","tag-heat-treat","tag-extrusion","tag-quality-manager","tag-iatf16949","tag-edm","tag-iso9001","tag-finishing"],"acf":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/posts\/2044","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/comments?post=2044"}],"version-history":[{"count":1,"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/posts\/2044\/revisions"}],"predecessor-version":[{"id":2045,"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/posts\/2044\/revisions\/2045"}],"wp:attachment":[{"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/media?parent=2044"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/categories?post=2044"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/tags?post=2044"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}