{"id":1748,"date":"2022-12-13T20:11:45","date_gmt":"2022-12-14T00:11:45","guid":{"rendered":"http:\/\/mriomega.com\/?p=1748"},"modified":"2025-09-05T01:40:47","modified_gmt":"2025-09-05T05:40:47","slug":"senior-ic-engineer-209285-bsee-pe-oil-gas-pipeline-paper-mill-design-installation-upgrade-troubleshoot-commission-will-relo-all-us","status":"publish","type":"post","link":"https:\/\/mriomega.com\/index.php\/controls-automation\/senior-ic-engineer-209285-bsee-pe-oil-gas-pipeline-paper-mill-design-installation-upgrade-troubleshoot-commission-will-relo-all-us\/","title":{"rendered":"Senior I&#038;C Engineer (209285) BSEE, PE \/ Oil-Gas, Pipeline, Paper Mill \/ Design, Installation, Upgrade, Troubleshoot, Commission \/ Will Relo all US"},"content":{"rendered":"\n<p class=\"has-white-color has-vivid-cyan-blue-background-color has-text-color has-background\"><strong>Senior EI&amp;C Engineer with 20+ years experience in electrical and control systems design and commissioning for oil &amp; gas, pipeline, compressor stations, mining, and paper mill industries. <\/strong>Experienced in all facets of EI&amp;C project execution: conceptual, estimating, front-end engineering, planning, detailed engineering, testing, construction, installation, troubleshooting, commissioning, as well as project management. Extensive experience leading engineering design teams on both large and small projects and bringing projects to completion on schedule. Able to manage complete projects. <\/p>\n\n\n\n<p>\u2022 Write control narratives, review P&amp;IDs, QA\/QC on Instrument database for a large American O&amp;G client. (2022).<br>\u2022 Oversee a team of engineers\/programmers in the upgrading and updating of a number of gathering and processing \u2022 facilities for Conoco Phillips.<br>\u2022 Design Lead on two projects to upgrade two gas turbine control panels and one Station control panel from GE to Control Logix.<br>\u2022 The DCS commissioning was behind schedule when I started and the project ended up making on-spec product approximately one week ahead of schedule.<br>\u2022 I&amp;C Lead (Utilities) on a multi-billion dollar project to increase production at the Albian facility from 155,000 to 255,000 bpd.<br>\u2022 Lead I&amp;C team in the development of all engineering deliverables required to install and commission a 20 MW low-pressure steam turbine.<br>\u2022 Led two engineering teams during the design phase of an SIS and BPCS upgrade of two Agrium ammonia distribution terminals.<br>\u2022 I&amp;C Lead on an oil processing facility expansion from 100,000 to 150,000 bpd.<br>\u2022 Develop I&amp;C drawings<br>\u2022 Writing Sequence Of Operations And Logic Diagrams<br>\u2022 Designing Field Process Control Loops \/ Instrumentation<br>\u2022 Check out, calibrate and troubleshoot field instruments<br>\u2022 Implementing system upgrades and modifications<br>\u2022 Specifying Field Process Control Loops \/ Instrumentation<br>\u2022 Troubleshooting Field Process Control Loops \/ Instrumentation<br>\u2022 Programming\/configuring DCS, PLCs and HMI systems<br>\u2022 Calibrating Field Process Control Loops \/ Instrumentation<br>\u2022 Calibrate and troubleshoot field instruments such as pressure and temperature transmitters<br>\u2022 Performing Field Inspections<br>\u2022 Improve equipment performance, reliability, and throughput.<br>\u2022 Turbomachinery Controls<br>\u2022 Engineering Flow Diagrams<br>\u2022 Reviewing Drawings \/ Schematics<br>\u2022 Block Flow Diagrams<br>\u2022 Creating Instrumentation Installation Drawings<br>\u2022 Process Flow Diagrams<br>\u2022 Specifications Development<br>\u2022 Control Panel Drawings<br>\u2022 Safety Hazard Analysis<br>\u2022 Process Hazard Assessment PHA<br>\u2022 HVAC Systems<br>\u2022 PLC Programming \/ Troubleshooting<br>\u2022 Allen Bradley PLCs<br>\u2022 GE PLCs<br>\u2022 Rockwell PLCs<br>\u2022 PID<br>\u2022 Sensors<br>\u2022 Transmitters<br>\u2022 SCADA<br>\u2022 Control Panels<br>\u2022 HMIs<br>\u2022 Flowmeters<br>\u2022 Pipeline Operations<br>\u2022 Paper Mill<br>\u2022 Construction Projects<br>\u2022 Mining Operations<br>\u2022 Pipeline Operations<br>\u2022 Compressor Stations<br>\u2022 Valve Positioners<br>\u2022 Electrical Controls<br>\u2022 Hydraulic Controls<br>\u2022 Pneumatic Controls<br>\u2022 Data Acquisition<br>\u2022 Equipment Startup<br>\u2022 Managing I\/C Projects<br>\u2022 Troubleshooting Process Control Loops<br>\u2022 Root Cause Problem Solving<br>\u2022 Improving System Reliability<br>\u2022 Batch Operations<br>\u2022 Continuous Process Operations<br>\u2022 Upgrading Systems<\/p>\n\n\n\n<p class=\"has-white-color has-vivid-cyan-blue-background-color has-text-color has-background\"><strong>EDUCATION<\/strong><\/p>\n\n\n\n<p>\u2022 B.Sc. Electrical Engineering,<br>\u2022 Air Conditioning &amp; Refrigeration Engineering Diploma<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Senior EI&amp;C Engineer with 20+ years experience in electrical and control systems design and commissioning for oil &amp; gas, pipeline, compressor stations, mining, and paper mill industries. Experienced in all facets of EI&amp;C project execution: conceptual, estimating, front-end engineering, planning, detailed engineering, testing, construction, installation, troubleshooting, commissioning, as well as project management. Extensive experience leading&#8230;<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[308,310],"tags":[55,57,98,167,272,516,519,538,588],"class_list":["post-1748","post","type-post","status-publish","format-standard","hentry","category-controls-automation","category-maintenance","tag-automation","tag-plc","tag-electrical","tag-electrical-engineer","tag-dcs","tag-instrument-controls-engineer","tag-pipeline","tag-paper-mill","tag-gas"],"acf":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/posts\/1748","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/comments?post=1748"}],"version-history":[{"count":2,"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/posts\/1748\/revisions"}],"predecessor-version":[{"id":1797,"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/posts\/1748\/revisions\/1797"}],"wp:attachment":[{"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/media?parent=1748"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/categories?post=1748"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/tags?post=1748"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}