{"id":1504,"date":"2022-09-12T15:23:23","date_gmt":"2022-09-12T19:23:23","guid":{"rendered":"https:\/\/mriomega.com\/?p=1504"},"modified":"2025-09-05T01:43:01","modified_gmt":"2025-09-05T05:43:01","slug":"operations-manager-210859-mba-bs-ind-engineering-casting-machining-injection-molding-will-relo","status":"publish","type":"post","link":"https:\/\/mriomega.com\/index.php\/production-operations-quality\/operations-manager-210859-mba-bs-ind-engineering-casting-machining-injection-molding-will-relo\/","title":{"rendered":"Operations Manager (210859) MBA, BS Ind Engineering \/ Casting, Machining, Injection Molding \/ Will Relo"},"content":{"rendered":"\n<p class=\"has-text-color has-background has-very-light-gray-color has-vivid-cyan-blue-background-color\"><strong>20+ years of multi-industry manufacturing experience. <\/strong> He has an MBA and a BS in Industrial Engineering and a solid working knowledge of low-pressure die casting, injection molding, grinding, machining, blast furnaces, heat treating, and more.  He is an accomplished results-driven change agent formally trained in the Lean Toyota Productive System, JIT, Constraint Management, 5S, Kaizen, and Continuous Improvement Methodology.   <strong>He has delivered some impressive results and cost savings using these skillsets!  He brings experience, success, and serious skills to the table which make him a strong candidate for anyone needing to improve their manufacturing operations!   He is willing to relocate <\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\"><li><strong>MBA and a BS in Industrial Engineering and a solid working knowledge of low-pressure die casting, injection molding, grinding, machining, blast furnaces, heat treating, and more<\/strong><\/li><li><strong>Successfully Increased on-time delivery from 95% to 97.8%<\/strong><\/li><li><strong>Reduced the cost of quality by 20% year over year.<\/strong><\/li><li><strong>Reporting to the COO. Direct Reports: managers, engineers, supervisors, planners, and inspectors. Total Staffing 265 direct &amp; indirect<\/strong><\/li><li><strong>Successfully increased throughput by 30% year over year.<\/strong><\/li><li><strong>Successfully reduced labor costs by 20% year over year.<\/strong><\/li><li><strong>Reduced scrap from 1.15% of sales to 0.55% of sales<\/strong><\/li><li><strong>Reduced operation costs by 10% &amp; reduced raw material costs by 25% through the use of Lean Methodology.<\/strong><\/li><li><strong>Directed a Kaizen team event on process control that reduced direct labor costs by $360,000 per year.<\/strong><\/li><li><\/li><\/ul>\n\n\n\n<p>\u2022    <strong>Reduced operation costs by 10% &amp; reduced raw material costs by 25% through the use of Lean Methodology.<br> \u2022    Reduced raw material shrinkage by 20% by implementing a material handling process.<br> \u2022    Managed, designed, and implemented a program to introduce new products from concept to production that increased new product ramp-up by 40%. <\/strong><\/p>\n\n\n\n<p>\u2022   <strong> Directed a Kaizen team event on 5s that reduced equipment downtime by 40% &amp; created a visual factory.<br> \u2022    Directed a Kaizen team event on process control that reduced direct labor costs by $360,000 per year.<br> \u2022    Reduced direct labor cost in fabrication center by $500,000 per year through Lean Methodology.<\/strong><\/p>\n\n\n\n<p class=\"has-text-color has-background has-very-light-gray-color has-vivid-cyan-blue-background-color\"><strong>EDUCATION<\/strong><\/p>\n\n\n\n<p>\u2022    Masters of Business Administration, Roosevelt University, Schaumburg, <br> \u2022    Bachelor of Science in Industrial Engineering, Roosevelt University, Chicago<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li><\/li><\/ul>\n","protected":false},"excerpt":{"rendered":"<p>20+ years of multi-industry manufacturing experience. He has an MBA and a BS in Industrial Engineering and a solid working knowledge of low-pressure die casting, injection molding, grinding, machining, blast furnaces, heat treating, and more. He is an accomplished results-driven change agent formally trained in the Lean Toyota Productive System, JIT, Constraint Management, 5S, Kaizen,&#8230;<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[312,311],"tags":[82,115,117,152,199,259,348,558],"class_list":["post-1504","post","type-post","status-publish","format-standard","hentry","category-plant-manager","category-production-operations-quality","tag-mba","tag-lean","tag-machining","tag-casting","tag-engineering","tag-injection-molding","tag-jit","tag-kzen"],"acf":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/posts\/1504","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/comments?post=1504"}],"version-history":[{"count":1,"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/posts\/1504\/revisions"}],"predecessor-version":[{"id":1505,"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/posts\/1504\/revisions\/1505"}],"wp:attachment":[{"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/media?parent=1504"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/categories?post=1504"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/tags?post=1504"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}