{"id":1008,"date":"2021-04-15T09:19:24","date_gmt":"2021-04-15T13:19:24","guid":{"rendered":"https:\/\/mriomega.com\/?p=1008"},"modified":"2025-09-05T01:43:09","modified_gmt":"2025-09-05T05:43:09","slug":"engineering-and-maintenance-reliability-manager-192507-cmrp-will-relo","status":"publish","type":"post","link":"https:\/\/mriomega.com\/index.php\/engineering\/engineering-and-maintenance-reliability-manager-192507-cmrp-will-relo\/","title":{"rendered":"Engineering and Maintenance Reliability Manager (192507) CMRP \/ Will relo"},"content":{"rendered":"\n<p class=\"has-text-color has-background has-very-light-gray-color has-vivid-cyan-blue-background-color\"><strong>Swiss Army knives are great tools that do it all. <\/strong> <strong>Who wouldn&#8217;t want an Engineering\/Maintenance Leader with diverse leadership experience in plant management, maintenance leadership, project management, cost controls, and engineering design on their plant leadership team?   Sure but where does this unicorn exist?  THE ANSWER IS RIGHT HERE!<\/strong><\/p>\n\n\n\n<p class=\"has-text-color has-background has-very-light-gray-color has-vivid-cyan-blue-background-color\">He is highly skilled in planning and running Maintenance\/Reliability, turnarounds,  and Capital Projects in the chemical industry.  <strong>He is a Certified Maintenance Reliability Professional whose hands-on leadership demonstrates the highest level of performance, and management of costs and assets to maximize the return on investment. <\/strong> He has held progressive roles in chemical manufacturing and has amassed a track record of improving performance in production, productivity, equipment uptime, cost savings, and safety,  Get into a conversation with him and you soon discover he has a passion for applying continuous improvement to work processes and resource utilization.  Plus it gets better!  He is willing to relocate!  <\/p>\n\n\n\n<p>\u2022   <strong> Skilled in engineering\/maintenance\/turnarounds\/capital project <br> \u2022    3 yrs. direct engineering\/design &#8211; Chemical<br> \u2022    3 years direct Project Engineering\/Maintenance\/Reliability -Pulp &amp; Paper\/Power Generation<br> \u2022    21 years direct Maintenance\/Reliability\/Turnaround\/Capital Project\/Plant Management &#8211; Chemical<br> \u2022    8 years Project Management\/Project Controls Management\/Contract Management &#8211; Refining\/Chemical<\/strong><br>  \u2022    Led culture change management for an organization improving safety performance from a 4.0 Total Injury Frequency Rate (TIFR) with 2 separate Lost Workday cases, to a current safety performance of 0.0 TIFR for two-plus years, with zero Lost Workday cases, zero Recordable Injuries, and eighteen months zero First Aid cases.<br> \u2022   <strong> Achieved record annual production rates in 2008, and 2011, along with record production rates for best month, best week, and best single day.<\/strong><br> \u2022    Implemented continuous monitoring of key process variables, and development of key operating targets with ownership of those targets being operator owned. <br><strong> o    Improved production yields by 15%<\/strong><br> Provided regular technical engineering support and guidance in the scope development and cost estimation of capital projects for both Mechanical and Instrument\/Electrical\/Controls. <br> Established safety performance guidelines and expectations to ensure workplace safety was significantly <strong>improved from an Incident Rate of over 8.0 prior to 2003 to less than 1.0 beginning calendar <\/strong><br> \u2022    Re-organized Maintenance structure and organization consistent with Asset Management Strategy and philosophy.<br> \u2022    Initiated full utilization of SAP Computerized Maintenance Management System including preventive Maintenance Plans, backlog management, priority coding, and equipment failure tracking.<br> \u2022    Established Preventative Maintenance Plans with supervisors and planners utilizing SAP and a streamlined reliability-centered maintenance approach, including vibration\/condition monitoring program, and infra-red thermography monitoring where practical.  <br> \u2022    Provide leadership to a team of planners, engineers, and technicians in support of routine plant operations and maintenance activities, as well as plant turnarounds.<br> \u2022    Provided leadership for the formation and transition a new plant team comprised of Maintenance and Operational planners, schedulers, technical advisors, and support personnel.  This team fostered the maintenance work processes which.<br> o    <strong>Increased operational uptime.  <br> o    We were running under 12,000 barrels\/day and raised it to 14,500 barrels\/per day.<br> o    Improved, equipment reliability and reduced needed turnarounds by 50%<br> o    Achieved cost reductions of $12M down to $8M on the maintenance budget.  <\/strong><br> \u2022   <strong> Responsible for the planning and execution coordination of major maintenance and repair, catalyst changeout, and plant shutdown activities achieving the goal of<br> o    No injuries<br> o    No environmental impacts<br> o    On-time completion of the planned schedule<br> o    Cost expenditure at or underestimated budget for outages in the last 5 years.  <\/strong><br> \u2022    Provided engineering technical support in mechanical, electrical, instrumentation, civil, and process operations capacities for troubleshooting maintenance and operational problems.  <br> \u2022    Provided front-line direction and leadership to Maintenance Planning and Support Team consisting of planners, scheduler, engineers, advisors, and clerical\/administrative personnel.<br> \u2022    Implemented planning and scheduling CMMS for daily planned maintenance activities<br><strong> Implemented equipment Preventative Maintenance activities, and Predictive Maintenance tools and strategies achieving the highest on-stream equipment availability in plant history, 100% for 20 consecutive months.<\/strong><br> \u2022    Initiated methodology to track and analyze equipment failures thereby reducing maintenance and repair costs.<\/p>\n\n\n\n<p>\u2022    Developing Standard Operating Procedures<br> \u2022    Ensuring Process Equipment Application Suitability<br> \u2022    Equipment Utilization Metrics<br> \u2022    Establishing Written Procedures<br> \u2022    Managing PM Work Orders<br> \u2022    Eliminating Work Order Backlogs<br> \u2022    Mechanical Integrity Maintenance Training<br> \u2022    Process Safety Management (PSM)<br> \u2022    Reducing Mechanical Breakdowns<br> \u2022    Maintaining ASME Certifications on Pressure Vessels<br> \u2022    Maintaining Mechanical Integrity Documentation<br> \u2022    Maintaining Process Equipment Inspection Documentation<br> \u2022    API Codes \/  ASME Codes \/ ISA Codes<br> \u2022    Asset Integrity Management systems<br> \u2022    Current Good Manufacturing Practices (cGMP)<br> \u2022    Failure Analysis Investigations<br> \u2022    Finite Element Method<br> \u2022    Identifying Equipment Deficiencies<br> \u2022    Improving Equipment Reliability<br> \u2022    Inspection \/ Testing Task Planning<br> \u2022    Inspection, Testing and Preventive Maintenance (ITPM) plans<br> \u2022    Management of Change (MOC)<br> \u2022    Reliability Centered Maintenance<br> \u2022    Reliability Modeling<br> \u2022    Risk Analysis<br> \u2022    Root Cause Failure Analysis (RCFA)<br> \u2022    Corrosion Analysis<br> \u2022    Design Failure Analysis<br> \u2022    Fatigue \/ Creep Analysis<br> \u2022    Fault Tree Analysis<br> \u2022    Non-Destructive Testing<br> \u2022    Testing Process Equipment<br> \u2022    Thermal Stress Analysis<br> \u2022    Thermography<br> \u2022    Vibration Fatigue Analysis, alignment<br> \u2022    Weibull Analysis<br> \u2022    Training Contractors on Processes<\/p>\n\n\n\n<p class=\"has-text-color has-background has-very-light-gray-color has-vivid-cyan-blue-background-color\"><strong>Education &amp; Certifications&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; <\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\"><li><strong>Bachelor of Science Electrical Engineering Technology<\/strong> (Process Control) University of Houston <\/li><li><strong>Certified Maintenance Reliability Professional<\/strong> #02035 \u2013 Society for Maintenance Reliability Professionals <\/li><li>Industrial Fire Fighter Training \u2013 Texas A&amp;M, College Station, TX<\/li><li>Incident Command Training \u2013 Texas A&amp;M, College Station, TX<\/li><\/ul>\n","protected":false},"excerpt":{"rendered":"<p>Swiss Army knives are great tools that do it all. Who wouldn&#8217;t want an Engineering\/Maintenance Leader with diverse leadership experience in plant management, maintenance leadership, project management, cost controls, and engineering design on their plant leadership team? Sure but where does this unicorn exist? THE ANSWER IS RIGHT HERE! He is highly skilled in planning&#8230;<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[307,310],"tags":[79,135,406],"class_list":["post-1008","post","type-post","status-publish","format-standard","hentry","category-engineering","category-maintenance","tag-cmms","tag-project-management","tag-maintenance-reliability-manager"],"acf":[],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/posts\/1008","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/comments?post=1008"}],"version-history":[{"count":1,"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/posts\/1008\/revisions"}],"predecessor-version":[{"id":1009,"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/posts\/1008\/revisions\/1009"}],"wp:attachment":[{"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/media?parent=1008"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/categories?post=1008"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mriomega.com\/index.php\/wp-json\/wp\/v2\/tags?post=1008"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}