Click Here & See All Of The Exceptional Talent We Are Working With

Plant Manager (76566) Green Belt / Automotive, Metals, Lighting / Forming, Heat Treat, Welding, Coating, Assembly, Fabrication / Will Relocate

This is your chance to put this’ Game Changer’s” impressive skills and experience in lean manufacturing principles, problem-solving techniques, financial analysis, team building, and change management to work for you! He is willing to relocate for the right opportunity. His notable skills include:

• Improved plant Safety to Achieve 1.5 years OSHA recordable free
• Improved Plant Margins and EBITDA by increasing labor efficiency and OEE
• Improved inventory accuracy from 85% to 98.5%

• Improved plant Safety Metrics from TIR of 16.55 in 2013 to 2.04 in 2017
• Sales growth from $33 million to $92 million over the past 3 years

• Cooper Standard Gold award for 2014, 2015, 2016, and 2017.
• Received General Motors Quality Achievement Award for 2015, 2016, 2017.
• 4 programs rated Cooper Standard Perfect Launch
• Cooper Standard launch of the year in 2017.
Reduced labor cost 15% through process improvements resulting in less overtime.
Reduced customer complaints by 65% from 2011 through 2013
Reduced plant scrap 22% through the implementation of a scrap review team that evaluated and tracked daily scrap driving corrective actions back to all shifts for both man and machine.
• Led plant cost savings initiative to exceed 2011, 2012, and 2013 goals of $2 million each year.
Increased equipment efficiency from 58% to 72% through better Preventive Maintenance systems along with involving line operators in the Preventive Maintenance process.
Reduced duration of line Preventive Maintenance from 14 hours down to 10 hours.
• Reduced plant scrap by over 2 full points from 6.03% to 3.87% resulting in a $2.5M savings.
• Improved on time delivery from 75% to over 90%.
• Improved units per paid hour 36%.

Reduced backlog from $3.5 million to under $250 thousand.
• Reduced lost time incidents from eight in 2005 to four in 2006 and to one in 2007.
• Reduced plant DPMU 70% in 2006 & 2008.
• Improved on-time delivery to customers from 80% to 95%.
• Improved plant productivity 10% over two years.
• Led Kaizen and Continuous events for plant and office.
o Led 20 kaizen events (led three Shingijutsiu Events), six Value Stream Mapping events, 12 Standard Work /Kanban events and numerous process improvement projects.

• Forming Operations
• Heat Treat Operations –
• Metal Finishing Operations
• Welding Operations
• Assembly Operations
• Fabrication Operations
• Coating Operations
• Adjusting Production Schedules
• Establishing Production Sequences
• Manufacturing Operations
• Cell Manufacturing Operations
• Batch Manufacturing Operations
• Fabrications Operations
• Automotive / Component Manufacturing
• Coatings Manufacturing
• Equipment Parts / Component Manufacturing
• Lighting / Component Manufacturing
• Fabricated Metal, and Machinery Manufacturing
• Pulp / Paper Manufacturing
• Calculating Production / Labor/ Material Costs
• Continuous Improvement Projects
• Process Optimization
• Process Troubleshooting
• Implementing Lean into Manufacturing
• Increasing Production Capacity
• Increasing Throughput
• Reducing Scrap
• Creating/Implementing Operations Metrics
• Using Visual Systems
• Running Operations on Metrics
• Demand Planning
• Inventory Staging
• Driving Cost Reduction
• Ensuring Future Material Availability
• Ensuring Optimal Inventory
• WIP Inventory Management
• Inventory Controls
• Meeting Manufacturing Delivery Targets
• Holding Kaizen Events
• Holding Kanban Events
• 5S / 6S Methods
• Production Layouts
• Identifying Capacity Requirements
• Preparing Production Schedules
• Resolving Production Bottlenecks / Problems
• Controlling Labor Costs
• Improving Manufacturing Processes
• Scheduling Materials / Labor
• ERP Systems / MRP Systems
• Root Cause Analysis
• Statistical Process Control SPC
• Maintaining Production Paperwork
• Value Stream Mapping

• Six Sigma Green Belt: University of Michigan, College of Engineering
• Certified Trained Team Leader in Standard Work, 5S, SMED and TPM through Acuity Brands University Lean Training Program
• Mistake-Proofing: Eastern Michigan University
• Advanced Product Quality Planning (APQP): Eastern Michigan University
• Internal Auditing: Eastern Michigan University
• TS16949; QS-9000
• OSHA 10 Hour Card
• People Skills and Conflict Management presented by the Ridge Group
• Lean Manufacturing Overview and Simulation: Georgia Tech